Tender Details
Particulars | Details |
---|---|
Title |
Work Contract For Operation And Maintenance Along With Housekeeping Of Coal Handling Plant Of Chp I And Manual Unloading Of Coal From Coal Rake At Track Hopper For 2 X600 Mw, Phase I, Sstpp, Mppgcl, Dongalia, For The Period Of 2 Years (24 Months)
|
Description |
Work Contract For Operation And Maintenance Along With Housekeeping Of Coal Handling Plant Of Chp I And Manual Unloading Of Coal From Coal Rake At Track Hopper For 2 X600 Mw, Phase I, Sstpp, Mppgcl, Dongalia, For The Period Of 2 Years (24 Months)
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2025_MPPGC_404043_1 |
Reference Number |
WT-2637 |
Tender Fee | 6180 |
EMD | 43.81 Lakh |
Tender Value | |
Place | SSTPP MPPGCL DONGALIA |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=484121 |
Start Date | March 20, 2025 17:00 |
End Date |
21/04/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for excavation, removal and transportation of ash accumulated inside silos of ph-i at 2x600 mw, sstpp, mppgcl, dongalia.
Work contract for excavation, removal and transportation of ash accumulated inside silos of ph-i at 2x600 mw, sstpp, mppgcl, dongalia.
Read moreWork contract for aoh of boiler pressure part of unit 4, 2x660 mw, sstpp, mppgcl,dongalia.
Work contract for aoh of boiler pressure part of unit 4, 2x660 mw, sstpp, mppgcl,dongalia.
Read moreSealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreRequest of proposal for operation and maintenance contract of 800 kld stp at gulmarg parisar phase-i at kanadia village developed by indore municipal corporation under pradhan mantri awas yojna, indore for a period of 03 years
Request of proposal for operation and maintenance contract of 800&#x0d kld stp at gulmarg parisar phase-i at kanadia village developed by&#x0d indore municipal corporation under pradhan mantri awas yojna,&#x0d indore for a period of 03 years
Read moreCleaning of conveyors related to unloading through wagon tippler (new) along with cleaning of hopper grill of wagon tippler under coal handling plant of dpl
Cleaning of conveyors related to unloading through wagon tippler (new) along with cleaning of hopper grill of wagon tippler under coal handling plant of dpl
Read moreAnnual rate contract for operation and maintenance of medical psa oxygen generation plant and medical oxygen piping system installed at dpa hospital, gopalpuri for the period of 5 years
Annual rate contract for operation and maintenance of medical psa oxygen 
 generation plant and medical oxygen piping system installed at dpa hospital, 
 gopalpuri for the period of 5 years
Read moreWork contract for mineral wool insulation of pipelines in tg area at 2x600 mw, sstpp, mppgcl, dongalia
Work contract for mineral wool insulation of pipelines in tg area at 2x600 mw, sstpp, mppgcl, dongalia
Read moreBiennial (two years) maintenance work contract for assistance in day to day routine maintenance of (ht/lt) electrical equipment and auxiliaries and lift operation of 210 mw unit no. 5, atps, mppgcl, chachai
Biennial (two years) maintenance work contract for assistance in day to day routine maintenance of (ht/lt) electrical equipment and auxiliaries and lift operation of 210 mw unit no. 5, atps, mppgcl, chachai
Read moreRate contract for obtaining service of oem rockwell automation engineer visit and remote assistance for checking , troubleshooting of rockwell plc s installed in bop area of 2x600 mw, sstpp, dongalia for 1 year.
Rate contract for obtaining service of oem rockwell automation engineer visit and remote assistance for checking , troubleshooting of rockwell plc s installed in bop area of 2x600 mw, sstpp, dongalia for 1 year.
Read more- housekeeping technological cleaning and material handling in by-product plant for a period of 2 years in 3 mtpa integrated steel plant at nagarnar
- housekeeping technological
 cleaning and material handling in by-product plant for a
 period of 2 years in 3 mtpa integrated steel plant at
 nagarnar
Read moreof your Industry type