Tender Details
Particulars | Details |
---|---|
Title |
A) Repairing, Changing And Overhauling Of Washed Coal Bunker Pneumatic Cylinder Of Unit No. 1 A, 1 B, 2 A, 2 B, 3 B, 4 A And 4 B (07 Nos.) Including Silver Changing Hose Pipe Pneumatic Valve In Rlb Section B) Repairing And Replacement Of Pneumatic Gate Of U
|
Description |
A) Repairing, Changing And Overhauling Of Washed Coal Bunker Pneumatic Cylinder Of Unit No. 1 A, 1 B, 2 A, 2 B, 3 B, 4 A And 4 B (07 Nos.) Including Silver Changing Hose Pipe Pneumatic Valve In Rlb Section B) Repairing And Replacement Of Pneumatic Gate Of U
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_299827_1 |
Reference Number |
PO/KTW/EnM(PR)/eTen/23-24/178 |
Tender Fee | 0 |
EMD | 3800 |
Tender Value | |
Place | Kathara Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310584 |
Start Date | January 30, 2024 16:30 |
End Date |
08/02/2024 ( Expired 438 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of expansion bellow of gt- 1 and 2, uat-1a and 1b,uat -2a and 2b and o-ring for bus duct insulator for u-1 and 2 oh under em-oph dept. at bktps.
Procurement of expansion bellow of gt- 1 and 2, uat-1a and 1b,uat -2a and 2b and o-ring for bus duct insulator for u-1 and 2 oh under em-oph dept. at bktps.
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreA)dismantling, fitting, repairing and overhauling of u-1400 radicon gear box of new bunkers washed coal repairing and burnt motor replacement and new motor fitting in rlb section of kathara washery b)i) repairing and thorough overhauling of gear box
A)dismantling, fitting, repairing and overhauling of u-1400 radicon gear box of new bunkers washed coal repairing and burnt motor replacement and new motor fitting in rlb section of kathara washery b)i) repairing and thorough overhauling of gear box
Read moreRepairing and changing of take-up drums vertical structure at new bunker washed coal washed coal power belt in rlb section of kathara washery
Repairing and changing of take-up drums vertical structure at new bunker washed coal washed coal power belt in rlb section of kathara washery
Read moreEchpii attending breakdown and prive mechanical maintenance in bfd 4a 4b, sc 1a 1b, 2a 2b, eds 1a 1b, 2a 2b , sfd 2a 2b and conveyor 48a1 48b1 in secondary crusher houseii.
Echpii attending breakdown and prive mechanical maintenance in bfd 4a 4b, sc 1a 1b, 2a 2b, eds 1a 1b, 2a 2b , sfd 2a 2b and conveyor 48a1 48b1 in secondary crusher houseii.
Read moreA)complete repairing/making of bearing housing and its block etc. of tail drum and head drum of unit no. 493 and stand by b)repairing and overhauling of 4 nos. audco valve size 250mm dia for delivery line and suction line of fine coal section of kath
A)complete repairing/making of bearing housing and its block etc. of tail drum and head drum of unit no. 493 and stand by b)repairing and overhauling of 4 nos. audco valve size 250mm dia for delivery line and suction line of fine coal section of kath
Read moreRepairing of two numbers coal bunker with ss plate and ms plate lining of u-4 at bktpp during unit overhauling
Repairing of two numbers coal bunker with ss plate and ms plate lining of u-4 at bktpp during unit overhauling
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreProviding and laying of road formation at new layout house sites in s.no 32/1a,1b,1c, 32/2,26/2,3a,3b,4a , 27/1, 2a,2b 32/ 1a ,1b,1c-2, ts no 17/1part,10/2 part,10/3 part,10/5 part,11/1part, 11/2 part,11/3 part,17/1 part, of pulikoradu village zone
Providing and laying of road formation at new layout house sites in s.no 32/1a,1b,1c, 32/2,26/2,3a,3b,4a , 27/1, 2a,2b 32/ 1a ,1b,1c-2, ts no 17/1part,10/2 part,10/3 part,10/5 part,11/1part, 11/2 part,11/3 part,17/1 part, of pulikoradu village zone
Read moreRepairing of two numbers coal bunker with ss plate and ms plate lining of u-4 at bktpp during unit overhauling
Repairing of two numbers coal bunker with ss plate and ms plate lining of u-4 at bktpp during unit overhauling
Read moreof your Industry type