Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
2 K W Continuous Wave Fiber Laser System
|
| Description |
2 K W Continuous Wave Fiber Laser System
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_IITR_769942_1 |
|
Reference Number |
2023240152/MM-6/2-kW/MIED/150 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Material Management, IIT Roorkee |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | September 12, 2023 20:30 |
| End Date |
Expired
20/09/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renewal of wave ptx subscription charges of motorola tlk 100 radios push to talk over cellular radios at slnsd devasthanam, yadagirigutta
Renewal of wave ptx subscription charges of motorola tlk 100 radios push to talk over cellular radios at slnsd devasthanam, yadagirigutta
Read moreProcurement of spare inverter (3125 kw), sineng electric make for ngel nokhra solar station
Procurement of spare inverter (3125 kw), sineng electric make for ngel nokhra solar station
Read moreConstruction of 11/0.433 kv sub-station (2 x 2500 kva) for bette thanda lis (4 x 325 kw) on musi river near bette thanda (v) in palakeedu (m) suryapet (d)
Construction of 11/0.433 kv sub-station (2 x 2500 kva) for bette thanda lis (4 x 325 kw) on musi river near bette thanda (v) in palakeedu (m) suryapet (d)
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreof your Industry type