Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting, Erection And Dismantling Of Ht Overhead Line Feeder F2, F5, F7 At Central Pump House Coal Section To Provide Power To Pumps Operation During Monsoon Period
|
Description |
Shifting, Erection And Dismantling Of Ht Overhead Line Feeder F2, F5, F7 At Central Pump House Coal Section To Provide Power To Pumps Operation During Monsoon Period
|
Organisation | Northern Coalfields Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Dudhichua NCL |
Link |
AAAAAAAAAA Login to view |
Start Date | June 20, 2025 18:00 |
End Date |
26/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Misc repair to b/r and e/m works incl connected items in power house/ pump house, oht/ ug sump and misc bldg at dilli pond, tipu line and balidan stambh at sunjuwan under ge jammu
Misc repair to b/r and e/m works incl connected items in power house/ pump house, oht/ ug sump and misc bldg at dilli pond, tipu line and balidan stambh at sunjuwan under ge jammu
Read more(a)repair, fabrication and erection of dividing chute of unit no. 315-355 and 318-358 at 9mtr level in hydro cyclone section and (b)repair, fabrication and erection of suction pipe, railing and stair under water pump house and shifting and fit
(a)repair, fabrication and erection of dividing chute of unit no. 315-355 and 318-358 at 9mtr level in hydro cyclone section and (b)repair, fabrication and erection of suction pipe, railing and stair under water pump house and shifting and fit
Read moreFabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Read more1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
Read moreExtension of 6.6kv o/h line (collection of pole with dismantling of pole from nocp)at basdeopur ocp(ii) for the erection of 6.6kv o/h line from hanuman bazar(near hiltop camp) to kankanee ocp patch b 13 seam,450 mtr.approx for the operation of pump
Extension of 6.6kv o/h line (collection of pole with dismantling of pole from nocp)at basdeopur ocp(ii) for the erection of 6.6kv o/h line from hanuman bazar(near hiltop camp) to kankanee ocp patch b 13 seam,450 mtr.approx for the operation of pump
Read moreFabrication and bituminus compounding of 10 nos suction sets and other pump accessories for pumps to be installed during monsoon at socp, ibva.
Fabrication and bituminus compounding of 10 nos suction sets and other pump accessories for pumps to be installed during monsoon at socp, ibva.
Read more(1)dismantling and route diversion of 3.3kv over head line power provide to seam west direction to new bench expose at akwmc ocp(2) 440-4 wire 5system erection for welding machine installtion at ocp of akwmc
(1)dismantling and route diversion of 3.3kv over head line power provide to seam west direction to new bench expose at akwmc ocp(2) 440-4 wire 5system erection for welding machine installtion at ocp of akwmc
Read moreShifting, erection and dismantling of ht overhead line feeder f2, f5, f7 at central pump house coal section to provide power to pumps operation during monsoon period
Shifting, erection and dismantling of ht overhead line feeder f2, f5, f7 at central pump house coal section to provide power to pumps operation during monsoon period
Read moreLaying by open trench method erection testing and commissioning of the ht lt oh line in to ht lt ug cable at mannargudi arulmigu rajagopalaswamy temple under the jurisdiction of town ii mannargudi section mannargudi division of thiruvarur edc
Laying by open trench method erection testing and commissioning of the ht lt oh line in to ht lt ug cable at mannargudi arulmigu rajagopalaswamy temple under the jurisdiction of town ii mannargudi section mannargudi division of thiruvarur edc
Read moreDewatering_jatragachi
Hiring and operation of dewatering pump sets at jatragachi bus stand (opposite to westin) during monsoon period.
Read moreof your Industry type