Tender Details
About Tender
๐ซ Procurement Opportunity: Attached Toilet & Electrical Installation Work For Dean's Chamber At Bhu ๐๐ง Banaras Hindu University, Under The Central Government, Is Seeking Bids For The Provision Of An Attached Toilet Along With Electrical Installation Work In The Chamber Of The Dean, Faculty Of Social Sciences. ๐ซ ๐ Bid Submission Deadline: April 27, 2024, 2:30 Pm ๐ธ Tender Fee: Inr 500 ๐ต Emd: Inr 5517 Interested Contractors Must Provide Detailed Bids That Include The Scope Of Work, Specifications, Pricing, And Timelines For Completion. The Project Requires Expertise In Both Plumbing And Electrical Installations, With A Focus On Quality And Adherence To Safety Standards. Keywords: Attached Toilet, Electrical Installation Work, Dean's Chamber, Banaras Hindu University, Government Tender, Construction Services, Bhu VaranasiParticulars | Details |
---|---|
Title |
Provision Of Attached Toilet Along With Electrical Installation Work In The Chamber Of The Dean, Faculty Of Social Sciences, Bhu
|
Description |
Provision Of Attached Toilet Along With Electrical Installation Work In The Chamber Of The Dean, Faculty Of Social Sciences, Bhu
|
Organisation | Banaras Hindu University | Central Govt. Ministry/Department |
Tender Id | 2024_BHU_804378_1 |
Reference Number |
UWD/2024/19042024-2 |
Tender Fee | 500 |
EMD | 5517 |
Tender Value | |
Place | UWD BHU VARANASI |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=845552 |
Start Date | April 20, 2024 20:00 |
End Date |
27/04/2024 ( Expired 386 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of main storage shed bonded ware house office building toilet block and electrical works crane installation commissioning work at eastern side of production hangars at bangalore complex
Construction of main storage shed bonded ware house office building toilet block and electrical works crane installation commissioning work at eastern side of production hangars at bangalore complex
Read moreSupply, installation, testing and commissioning of 100 mt capacity electronic pitless type road weighbridge including civil an electrical works along with 4 years of camc after 1 years of guarantee warranty period at 4 locations of ecl
Supply, installation, testing and commissioning of 100 mt capacity electronic pitless type road weighbridge including civil an electrical works along with 4 years of camc after 1 years of guarantee warranty period at 4 locations of ecl
Read moreCarrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Carrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConstruction of 2 nos. cabins with attached toilet along with repair and renovation of existing three nos. cabins and a store room at port hospital at haldia, hdc
Construction of 2 nos. cabins with attached toilet along with repair and renovation of existing three nos. cabins and a store room at port hospital at haldia, hdc
Read moreRenovation of new faculty house, construction of driver room with toilet,construction of lift pit in mdu rohtak
Renovation of new faculty house, construction of driver room with toilet,construction of lift pit in mdu rohtak
Read moreDesign, supply, installation, testing and commissioning of 33kv/6.6kv substation and allied electrical and civil work for providing power supply to 2 no. electric mhcs of apsez in nsd for container handling
Design, supply, installation, testing and commissioning of 33kv/6.6kv substation and allied electrical and civil work for providing power supply to 2 no. electric mhcs of apsez in nsd for container handling
Read moreof your Industry type