Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Kip Rb Canal Road Maintenance Renovation And Reconstruction Of Kip Canal Road From Chainage 12000m T0 15700m In Thenmala Panchayath General Civil Work
|
| Description |
General Kip Rb Canal Road Maintenance Renovation And Reconstruction Of Kip Canal Road From &Amp#X0d
Chainage 12000m T0 15700m In Thenmala Panchayath General Civil Work
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2025_Irrig_764444_1 |
|
Reference Number |
IRR/PII/TR/6823/2024_5_1_1/1 |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | - |
| Place | Thenmala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1312151 |
| Start Date | September 03, 2025 23:30 |
| End Date |
Expired
16/09/2025
Expired 393 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Greasing,overhauling of roller wheels,screw rod,and trail run of kip main canal shutters at ottakkal wier thenmala
Greasing,overhauling of roller wheels,screw rod,and trail run of kip main canal shutters at ottakkal wier thenmala
Read moreGeneral kip rb rectification work of karunagappally branch canal wells 6 nos from ch 5240 m to ch 5510 m in vallikunnam panchayath in mavelikkara taluk general civil work
General kip rb rectification work of karunagappally branch canal wells 6 nos from ch 5240 m to ch 5510 m in vallikunnam panchayath in mavelikkara taluk general civil work
Read moreGeneral kip rb urgent rectification of enadimangalam distributory canal between the ch 2500m and ch 4000m general civil work
General kip rb urgent rectification of enadimangalam distributory canal between the ch 2500m and ch 4000m general civil work
Read moreGeneral budget work kip rb punnala distributory rectification work to prevent leakage of canal between ch 6900m to 7110m and ch 7310m to 7600m near poovannamoodu in piravanthoor panchayath general civil work
General budget work kip rb punnala distributory rectification work to prevent leakage of canal between ch 6900m to 7110m and ch 7310m to 7600m near poovannamoodu in piravanthoor panchayath general civil work
Read moreGeneral rbmc near karuvatta church kip om rectification of rb main canal near ch52105m near karuvatta church in adoor municipality general civil work
General rbmc near karuvatta church kip om rectification of rb main canal near ch52105m near karuvatta church in adoor municipality general civil work
Read moreGeneral-kip(lb) obc-soil investigation for the reconstruction of the breached section of oyoor branch canal at ch. 9500 m in veliyam grama panchayat, kottarakkara constituency-investigation work
General-kip(lb) obc-soil investigation for the reconstruction of the breached section of oyoor branch canal at ch. 9500 m in veliyam grama panchayat, kottarakkara constituency-investigation work
Read moreGeneral-deposit-district panchayath-2026 27-emergency rectification of damaged left sidewall of peringottukavu branch canal chainage 0_350km and 0_380km and rectification of rs sidewalls of karimkulam branch near ch 1_950km-general civil work
Emergency rectification of damaged left sidewall of peringottukavu branch canal chainage 0_350km and 0_380km and rectification of rs sidewalls of karimkulam branch near ch 1_950km
Read moreGeneral kip rb canal road maintenance kip rb renovation and reconstruction of kip canal bank road from ch 8100m to 12000 m in thenmala grama panchayath general civil work
General kip rb canal road maintenance kip rb renovation and reconstruction of kip canal bank &#x0d road from ch 8100m to 12000 m in thenmala grama panchayath general civil work
Read moreGeneral kip rb canal road maintenance renovation and reconstruction of kip canal bank road from ch 590m to 1830 m in thenmala grama panchayath general civil work
General kip rb canal road maintenance renovation and reconstruction of kip canal bank road from ch 590m to 1830 m in thenmala grama panchayath general civil work
Read moreGeneral kip(rb)punnala distributory rectification work to pr overflow by raising sides of canal from chainage 30 m to 150m in piravanthoor panchayath
During&#x0d the water distribution period, a huge quantity of&#x0d water overflows through the sides of the canal&#x0d between chainages from 30m to 150m. the&#x0d water flows nearby houses, toilets, and wells,&#x0d affecting proper distribution through the canal.&#x0d
Read moreof your Industry type