Tender Details

Particulars Details
Title
Coverage For Insurance Of Hp Module During Transportation From Ntpc Barh
Description
Coverage For Insurance Of Hp Module During Transportation From Ntpc Barh(bihar) To M/S. Bhel, Haridwar
Organisation NTPC Limited | Public Sector Undertakings
Tender Id 2025_NTPC_97993_1
Reference
Number
NTPC/Barh STPP/9900305194
Tender Fee 0
EMD 0
Tender Value -
Place Barh Super Thermal Power Plant P.O. BARH BARH 8032
Link
View Original Tender Notice

https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=101191

Start Date June 20, 2025 17:30
End Date
Expired 05/07/2025

Expired 463 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of ms sheetal wireless spares at ntpc barh

Procurement of ms sheetal wireless spares at ntpc barh

Read more
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Read more
Supply of material/equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) 132/11kv sub-station at nellikal, (ii) 132kv lilo to proposed 132/11kv nellikal lis substation from the existing 132kv sc line from 220/132/11kv nagarjuna sagar receiving station to 132kv nagarjuna sagar left canal ss (1.5km) near nellikal(v), thirumalgiri-sagar mandal of nalgonda district on turnkey basis.

Supply of material/equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) 132/11kv sub-station at nellikal, (ii) 132kv lilo to proposed 132/11kv nellikal lis substation from the existing 132kv sc line from 220/132/11kv nagarjuna sagar receiving station to 132kv nagarjuna sagar left canal ss (1.5km) near nellikal(v), thirumalgiri-sagar mandal of nalgonda district on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Coverage for insurance of hp module during transportation from ntpc barh (bihar) to m/s. bhel, haridwar

Coverage for insurance of hp module during transportation from ntpc barh (bihar) to m/s. bhel, haridwar

Read more
Transportation of hp module from ntpc barh (bihar) to m/s. bhel,

Transportation of hp module from ntpc barh (bihar) to m/s. bhel,haridwar

Read more
Transportation of hp module

Transportation of hp modulefrom ntpc gadarwara to bhel haridwar

Read more
Contract for overhauling of hp module, inspection of tg brg no-1 to 7, thermal insulation of hp module at ntpc barh(2x660mw).

Contract for overhauling of hp module, inspection of tg brg no-1 to 7, thermal insulation of hp module at ntpc barh(2x660mw).

Read more
Click Here to Download Dockets