Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reinstatement Of Trenches Excavated By M/S Bharti Air Tel Ltd At Ttc Industrial Area Nerul
|
| Description |
Reinstatement Of Trenches Excavated By M/S Bharti Air Tel Ltd At Ttc Industrial Area Nerul
|
| Organisation | Navi Mumbai Municipal Corporation | State Govt. and UT |
| Tender Id | 2026_NMMC_1296526_1 |
|
Reference Number |
Tender/NMMC/ EE(NERUL) /04 / 2026-2027 |
| Tender Fee | 1090 |
| EMD | 21000 |
| Tender Value | - |
| Place | Excutive Eng (Nerul) |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2227378 |
| Start Date | April 21, 2026 15:30 |
| End Date |
Expired
05/05/2026
Expired 162 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reinstatement of trenches taken by various external and internal utilities in greater mumbai for period of two years for zone-i
Reinstatement of trenches taken by various external and internal utilities in greater mumbai for period of two years for zone-i
Read moreM and r to nrb in ttc indl area strengthening of fire alarm system at mahape office.
M and r to nrb in ttc indl area strengthening of fire alarm system at mahape office.
Read moreRestoration of ofc road cuts by bharti airtel ltd. at ramasamy salai, arcot road, p.v. rajamannar salai, ashok pillar main road d128 129 136 137 138 in z10 and jio digital fibre pvt. ltd. at chettiyar agaram main road (d150, z11).
Restoration of ofc road cuts by bharti airtel ltd. at ramasamy salai, arcot road, p.v. rajamannar salai, ashok pillar main road d128 129 136 137 138 in z10 and jio digital fibre pvt. ltd. at chettiyar agaram main road (d150, z11).
Read moreTtc and kalwa shifting of 500 mm dia drainage pumping main from plot no pap-571 to 574 and pap-582 to 589 along thane belapur service road between lokmat to dakc.
Ttc and kalwa shifting of 500 mm dia drainage pumping main from plot no pap-571 to 574 and pap-582 to 589 along thane belapur service road between lokmat to dakc.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreReinstatement of trenches excavated by mseb in south central road in ttc midc area nerul
Reinstatement of trenches excavated by mseb in south central road in ttc midc area nerul
Read more(92553) reinstatement of trenches excavated by msedcl from mtnl skywalk to reliance life science co. in ttc industrial area,ghansoli ward
(92553) reinstatement of trenches excavated by msedcl from mtnl skywalk to reliance life science co. in ttc industrial area,ghansoli ward
Read more(90871) reinstatement of trenches excavated by megavision digital fibre pvt. ltd. in digha
(90871) reinstatement of trenches excavated by megavision digital fibre pvt. ltd. in digha
Read moreReinstatement of mgl trenches in sector nerul 19,21,23,25,27,30,40,42 44,44a 36 58 nerul and belapur 15a 20 in belapur ward
Reinstatement of mgl trenches in sector nerul 19,21,23,25,27,30,40,42,44,44a 36 58 nerul and belapur 15a,20 in belapur ward
Read moreof your Industry type