Tender Details

Particulars Details
Title
Foundation Of 2 Ft Below The Ground Level,Leveling And Hard Standing 3 Inch Thick Of Cement Sand An
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/5156978
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date July 30, 2024 01:11
End Date
Expired 19/08/2024

Expired 785 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 3 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 ALPHA BUILDTECH - 19-08-2024 19:34:12 MII MSE Disqualified
2 BHAGWATI ENTERPRISES - 19-08-2024 12:40:01 MII MSE Qualified
3 K P TRADERS - 19-08-2024 12:36:16 MII MSE Qualified
4 RIGHT TRADING CO. - 19-08-2024 12:28:25 MII MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 BHAGWATI ENTERPRISES( MSE Social Category:General ) Item Categories : Foundation of 2 ft below the ground level,Leveling and Hard Standing 3 inch thick of Cement sand an 610330.00 L1
2 RIGHT TRADING CO.( MSE Social Category:General ) Item Categories : Foundation of 2 ft below the ground level,Leveling and Hard Standing 3 inch thick of Cement sand an 699200.00 L2
3 K P TRADERS( MSE Social Category:General ) Item Categories : Foundation of 2 ft below the ground level,Leveling and Hard Standing 3 inch thick of Cement sand an 760000.00 L3
Similar Tenders
Filing of sand in cabel trench repair of cable trench cover plate in various sections and hard standing by laying of moorum in parking shed ex.p.p.sanatorium area

Filing of sand in cabel trench repair of cable trench cover plate in various sections and hard standing by laying of moorum in parking shed ex.p.p.sanatorium area

Read more
Operation and maintenance of electrical systems/electrical installations - supply fixing of 7 mtr gi octagonal pole of approved make top dia 70mm bottom dia 130mm and base plate 12mm thick having 3mm thickness with on rcc foundation including the co..,operation and maintenance of electrical systems/electrical installations - supply and laying of aluminium conductor pvc insulated armoured served sheathed cables 1100 volts ldpe pipe for underground cable areated at a depth of 750 mm below ground lev..,operation and maintenance of electrical systems/electrical installations - supply laying of 50 mm hdpe pipe for under ground cable as required complete in all respect with laying charge including,operation and maintenance of electrical systems/electrical installations - supply and burring of safe earthing electrode t19 znzinc coated length 3000mm outer pipe 484mm x 32mm pipe 269mm x 26 terminal dia 12 mm coating 80100 micron filled with..,operation and maintenance of electrical systems/electrical installat

Operation and maintenance of electrical systems/electrical installations - supply fixing of 7 mtr gi octagonal pole of approved make top dia 70mm bottom dia 130mm and base plate 12mm thick having 3mm thickness with on rcc foundation including the co..,operation and maintenance of electrical systems/electrical installations - supply and laying of aluminium conductor pvc insulated armoured served sheathed cables 1100 volts ldpe pipe for underground cable areated at a depth of 750 mm below ground lev..,operation and maintenance of electrical systems/electrical installations - supply laying of 50 mm hdpe pipe for under ground cable as required complete in all respect with laying charge including,operation and maintenance of electrical systems/electrical installations - supply and burring of safe earthing electrode t19 znzinc coated length 3000mm outer pipe 484mm x 32mm pipe 269mm x 26 terminal dia 12 mm coating 80100 micron filled with..,operation and maintenance of electrical systems/electrical installat

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise