Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Eletrification Of 12 No. Unelectrified House Hold Connection In Dhanaycha Adiwasi Basti Habitation Village
|
| Description |
Estimate For Eletrification Of 12 No. Unelectrified House Hold Connection In Dhanaycha Adiwasi Basti Habitation Village Dhanaycha In Da Jgua Scheme Under Raghunathpur D/C Of North Dn Sheopur.
|
| Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
| Tender Id | 2025_MKVVC_428324_1 |
|
Reference Number |
DGM/STC/PUR/SHPR/25-26/25/906 |
| Tender Fee | 885 |
| EMD | 8310 |
| Tender Value | - |
| Place | DGM STC Office |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=504939 |
| Start Date | June 03, 2025 22:30 |
| End Date |
Expired
10/06/2025
Expired 492 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of janpad panchayat raipurkarchuliyan heera chaoraha paipakhara to adiwasi basti approach road length 2.60 km. p.w.d. under sub division manganwa (second call)
Construction of janpad panchayat raipurkarchuliyan heera chaoraha paipakhara to adiwasi basti approach road length 2.60 km. p.w.d. under sub division manganwa (second call)
Read more3rd call providing house hold tap connection for village burondi (part 3), tal - dapoli, dist - ratnagiri. year 2026-27. (ueeng only)
3rd call providing house hold tap connection for village burondi (part 3), tal - dapoli, dist - ratnagiri. year 2026-27. (ueeng only)
Read moreConstruction of pcc road from pasagam more to pasagam basti, at-pasagam, gp-rimee, block-lawalong, estimate cost-24109500
Construction of pcc road from pasagam more to pasagam basti, at-pasagam, gp-rimee, block-lawalong, estimate cost-24109500
Read moreParshuram chowk development work (providing and fixing paver block, construction of boundry wall, estimate of garden and pedestal) at ward no- 13 basti chowk anuppur.
Parshuram chowk development work (providing and fixing paver block, construction of boundry wall, estimate of garden and pedestal) at ward no- 13 basti chowk anuppur.
Read moreAt noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.
At noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.
Read moreConducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Read moreCarrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Read more(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
Read moreEstimate for eletrification of 12 no. unelectrified house hold connection in agra adiwasi basti habitation village agra in da-jgua scheme under vijaypur-i d/c of north dn sheopur.
Estimate for eletrification of 12 no. unelectrified house hold connection in agra adiwasi basti habitation village agra in da-jgua scheme under vijaypur-i d/c of north dn sheopur.
Read moreEstimate for eletrification of 15 no. unelectrified house hold connection in chandeli adiwasi basti habitation village medawali in da-jgua scheme under vijaypur-i d/c of north dn sheopur.
Estimate for eletrification of 15 no. unelectrified house hold connection in chandeli adiwasi basti habitation village medawali in da-jgua scheme under vijaypur-i d/c of north dn sheopur.
Read moreof your Industry type