Tender Details

Particulars Details
Title
General Mp 2025 26 Renovation Of Field Channel Ing At Ch 5/450 Km Of Pathirippala Branch Canal In B/W Ch 0/000 Km To 0/150 Km. General Civil Work
Description
Malampuzha Dam Is The Second Largest Dam And&Amp#X0d Reservoirs In Kerala,Located Near Palakkad, Built&Amp#X0d Post Independence By The Then Madras State.&Amp#X0d Situated In The
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_783741_1
Reference
Number
IRR/PI/TR/2932/2025_5_1_1/1
Tender Fee 1870
EMD 21175
Tender Value -
Place Pathirippala
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1286710

Start Date August 07, 2025 22:45
End Date
Expired 13/08/2025

Expired 391 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
General-mp-2024-25-renovation of field channel-ing from the sluice at ch1/500 km of pudhupariyaram branch canal from ch 0/450 km to ch 0/580 km-general civil work

The side walls and foundation of the proposed&amp#x0d portion of the field channel is seen damaged&amp#x0d and the whole strucneeds to be rectified for&amp#x0d the efficient conveyance of water and also to&amp#x0d reduce leakage. hence the provision for&amp#x0d reconstruction of this

Read more
General-mp-annual maintenance-2024-25 palappuram branch canal from ch. 0/000 km to 6/000 km.-general civil work

Malampuzha damis the second largest dam and&amp#x0d reservoirs in kerala,located near palakkad,built&amp#x0d post independence by the then madras state.&amp#x0d situated in the scenic hills of the western ghats&amp#x0d in the background it is a combination of a&amp#x0d masonry da

Read more
General-mp -2025-26- renovation works to the field channel-ing from sluice ch 7/000 km of rbc main canal from ch 0/200 to 0/350 km-general civil work

This work has been included under the&amp#x0d plan fund for the modernisation of the field&amp#x0d channels of the malampuzha project. the&amp#x0d proposed field channel ing from the sluice&amp#x0d at ch7/000 km from from main canal and serve&amp#x0d for an ayacut area of 12 ha

Read more
General-mp -annual maintenance 2024- 25-peringottukurissi canal from ch.0/000km to 6/950 km odannur branch canal from ch.0/000 km to 4/000 km and other branches -general civil work

General-mp -annual maintenance 2024-&amp#x0d 25-peringottukurissi canal from ch.0/000km to&amp#x0d 6/950 km odannur branch canal from ch.0/000&amp#x0d km to 4/000 km and other branches -general&amp#x0d civil work

Read more
General-mp-2025 -26-renovation works to the pathirippala branch canal-ut at ch 2/484 km-general civil work

Malampuzha dam is the second largest dam and&amp#x0d reservoirs in kerala,located near palakkad, built&amp#x0d post independence by the then madras state.&amp#x0d situated in the scenic hills of the western ghats&amp#x0d in the background it is a combination of a&amp#x0d masonry dam

Read more
General-mp-2025- 26-renovation works to the pathirippala branch canal-well at ch 3/500 km -general civil work

The right bank canals of malampuzha project&amp#x0d were constructed during the 1960s. the canals&amp#x0d have not been renovated for over 50 years since&amp#x0d its construction. huge loss of water occurs&amp#x0d through these canals during water distribution&amp#x0d due to leakage

Read more
General wp csp np 2025-2026 rectification works of chalai lbc canal in between ch 0 000 km to ch 0 275 km ch 0 450 to 0 500 km 2878 2025 general civil work

General wp csp np 2025-2026&amp#x0d rectification works of chalai lbc canal in&amp#x0d between ch 0 000 km to ch 0 275 km &amp#x0d ch 0 450 to 0 500 km 2878 2025 general&amp#x0d civil work&amp#x0d

Read more
General-mp-annual maintenance-2024- 2025-lb main canal between the ch 0/300 to ch 20/000 km -general civil work

General-mp-annual maintenance-2024- 2025-lb main canal between the ch 0/300 to ch 20/000 km -general civil work

Read more
General-mp-2024-25-renovation of field channel ing from sluice at 1/800 km of mankurussi branch canal from ch0/000 km to ch 0/275 km.-general civil work

&amp#x0d clearing jungle,demolishing concrete 1 3 6 for&amp#x0d old damaged swall,demolishing 1 4 8 for old&amp#x0d damaged canal bed,felling trees, earthwork&amp#x0d excavation, cc 1 4 8 using 40 mm b/stone for&amp#x0d bed concrete,cc 1 3 6 using

Read more
General-mp-2024-25-renovation of field channel ing from tail end field channel of thenur branch canal from ch 0/000 km to ch0/124 km-general civil work

The work has been included under the plan fund&amp#x0d for the renovation of the field channels of the&amp#x0d malampuzha project.the proposed field channel&amp#x0d of thenur branch canal have been constructed&amp#x0d long years back. theside walls and foundation of&amp#x0d the

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise