Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
40kw 380 Volt 3 Phase Tubular Electric Heater For Desalination Plant Boilers
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 24, 2025 16:33 |
End Date |
15/07/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreWork contract for filling of empty hydrogen cylinders and assistance in various operation and cleaning of compressor, generating unit, rectifier and other auxiliaries during shift at hydrogen plant no.ii and hydrogen plant 3 stps sarni
&#x0d work contract for filling of empty hydrogen cylinders and assistance in various operation and cleaning of compressor, generating unit, rectifier and other auxiliaries during shift at hydrogen plant no.ii and hydrogen plant 3 stps sarni
Read moreLt/c132-000-jx-mr-6810/01 - desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Read moreProvn of married accn for officers and airmen at 3 afsb gandhinagar (phase-i)
Provn of married accn for officers and airmen at 3 afsb gandhinagar (phase-i)
Read moreVariable frequency drive 2.2 kw 3 phase 380 to 500v,variable frequency drive 15 kw 3 phase 380 to 5
Read more
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreImprovement/augmentation of lt distribution system at cgae nedumbassery and provision of standby power supply cabling for cgae kochi and provision 3 phase supply for electric cooking range at ships galley and officers mess kitchen.
Improvement/augmentation of lt distribution system
 at cgae nedumbassery and provision of standby power
 supply cabling for cgae kochi and provision 3 phase
 supply for electric cooking range at ships galley and
 officers mess kitchen.
Read moreRfq 11539 for repairing of roads inside plant area at kcc phase iii
Rfq 11539 for repairing of roads inside plant area at kcc phase iii
Read moreSupply of trolley type industrial transformer drying oven, trolley for oven and 3 phase thyrister based panel
Supply of trolley type industrial transformer drying oven, trolley for oven and 3 phase thyrister based panel
Read moreWater supply arrangement for drawing 3 mld raw water from pazhassi reservoir to kinfra industrial park mattannur phase 1
Water supply arrangement for drawing 3 mld raw water from pazhassi reservoir to kinfra industrial park mattannur phase 1
Read moreof your Industry type