Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps I Operation Circle Ca Dn Cwph Reconditioning Of Released Worn Out Pump Casing In Cooling Water Pump
|
| Description |
Nctps I Operation Circle Ca Dn Cwph Reconditioning Of Released Worn Out Pump Casing In Cooling Water Pump
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_481179_1 |
|
Reference Number |
CE/NCTPS-I/SE/OPN/27/2024-25 |
| Tender Fee | 0 |
| EMD | 43000 |
| Tender Value | - |
| Place | NCTPS - I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=571656 |
| Start Date | September 06, 2024 00:00 |
| End Date |
Expired
19/09/2024
Expired 754 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreNctps i se m ii circle echs dn covering the coal loaded wagon by tarpaulins at nctps 1 and removal the same at destination point at mtps
Nctps i se m ii circle echs dn covering the coal loaded wagon by tarpaulins at nctps 1 and removal the same at destination point at mtps
Read moreTtps operation circle cad cwph i unit iii annual overhauling of internal and external assembly and reconditioning of c.w.p internal spares 3b, 3c and 3d of unit iii
Ttps operation circle cad cwph i unit iii annual overhauling of internal and external assembly and reconditioning of c.w.p internal spares 3b, 3c and 3d of unit iii
Read moreTtps operation circle cad fabrication and reconditioning of available worn out ms temporary transfer tanks of capacity 7 kl approx. for receiving raw water from lorries near auxiliary cooling water pump house unloading point i, ii and iii erecting th
Ttps operation circle cad fabrication and reconditioning of available worn out ms temporary transfer tanks of capacity 7 kl approx. for receiving raw water from lorries near auxiliary cooling water pump house unloading point i, ii and iii erecting th
Read moreTtps operation circle cad cwph i unit iii annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of unit iii
Ttps operation circle cad cwph i unit iii annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of unit iii
Read moreNctps i se m ii circle ahp dn breakdown routine maintenance of recovery water pump no 1 to 4 for a period of one year from the date of taken over of site
Nctps i se m ii circle ahp dn breakdown routine maintenance of recovery water pump no 1 to 4 for a period of one year from the date of taken over of site
Read moreS.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
S.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
Read moreNctps i se m ii circle ichs dn foph attending of steam oil leaks in valve glands pipe punctures valve flange bonnet in prds system towards foph by on line sealing method for a period of one year
Nctps i se m ii circle ichs dn foph attending of steam oil leaks in valve glands pipe punctures valve flange bonnet in prds system towards foph by on line sealing method for a period of one year
Read moreTtps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Ttps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Read moreof your Industry type