Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of 1010 Kva, 11 Kv Alternator Of Dg1 Installed At Pothead Yard, Parbati Iii Power Station
|
| Description |
Repairing Of 1010 Kva, 11 Kv Alternator Of Dg1 Installed At Pothead Yard, Parbati Iii Power Station
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_NHPC_763664_1 |
|
Reference Number |
PR11923/63/2 Repair of 1010 KVA 11 KV Alternator |
| Tender Fee | 0 |
| EMD | 12000 |
| Tender Value | - |
| Place | Parbati III Power Station |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 27, 2023 16:30 |
| End Date |
Expired
10/08/2023
Expired 1160 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance contract (amc) for a period of three (3) years for the mhi-make engine of the 1010 kva emergency diesel generator (dg) set installed at substation-3, ongc complex
Annual maintenance contract (amc) for a period of three (3) years for the mhi-make engine of the 1010 kva emergency diesel generator (dg) set installed at substation-3, ongc complex
Read moreTender for supply of equipment/material, design, erection, testing and commissioning of augmentation of existing 11/0.4 kv 25 kva sub-station parihar-iii (naghuien) to 63 kva along with three phase lt line from the augmented dtr
Tender for supply of equipment/material, design, erection, testing and commissioning of augmentation of existing 11/0.4 kv 25 kva sub-station parihar-iii (naghuien) to 63 kva along with three phase lt line from the augmented dtr in esd chamba 2
Read moreComprehensive amc of 4 nos numeric make 5 kva online ups for a period of 1 year installed at cm office block i 3rd flr conference hall iii 3rd floor and vc room ii 2nd flr of the new secretariat building capital complex agt
Comprehensive amc of 4 nos numeric make 5 kva online ups for a period of 1 year installed at cm office block i 3rd flr conference hall iii 3rd floor and vc room ii 2nd flr of the new secretariat building capital complex agt
Read moreNctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Nctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Read moreRepairing of 1010 kva, 11 kv alternator of dg#1 installed at pothead yard, parbati-iii power station
Repairing of 1010 kva, 11 kv alternator of dg#1 installed at pothead yard, parbati-iii power station
Read moreRestoration work of potable water supply line from pump station to pothead yard of parbati iii power station
Restoration work of potable water supply line from pump station to pothead yard of parbati iii power station
Read moreConstruction of pothead yard-420 kv bus reactor at power house site of parbati-h.e. project (stage-ii) (package no-c-807)
Construction of pothead yard-420 kv bus reactor at power house site of parbati-h.e. project (stage-ii) (package no-c-807)
Read moreNeutral grounding reactor (ngr) for 1010 kva dg set installed at 220 kv outdoor switchyard
Read more
General repairing, maintenance works of 220 kv pothead yard and metering works at vyasi hep.
General repairing, maintenance works of 220 kv pothead yard and metering works at vyasi hep.&#x0d &#x0d
Read moreof your Industry type