Tender Details
About Tender
๐ Procurement Opportunity: Steel Grider Bridge Construction ๐ ๏ธ๐ The Public Works Department, State Govt. And Ut, Invites Bids For The Comprehensive Design, Construction, Launching, And Commissioning Of A 25 Meter Span Steel Grider Bridge From Fanjila To Shuksherthang In Khaltsi, Including Allied Works. ๐๏ธ ๐ Bid Submission Deadline: June 25, 2024, 2:00 Pm Tender Fee: Inr 3000 Emd: Inr 525000 This Project Is Under The Special Development Project (Sdp). Interested Bidders Must Submit Detailed Proposals, Adhering To The Scope Of Work And The Stipulated Timelines. Keywords: Steel Grider Bridge, Construction, Public Works Department, State Govt. And Ut, Khaltsi, Sdp, Tender, Bid, EmdParticulars | Details |
---|---|
Title |
Design, Construction, Launching And Commissioning 25 Mtr Span Steel Grider Bridge From Fanjila To Shuksherthang Including Other Allied Work (As Per Scope Of Work) Under Sdp
|
Description |
Design, Construction, Launching And Commissioning 25 Mtr Span Steel Grider Bridge From Fanjila To Shuksherthang Including Other Allied Work (As Per Scope Of Work) Under Sdp
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2024_PWD_12927_1 |
Reference Number |
06 of R and B Khaltsi of 2024-25 |
Tender Fee | 3000 |
EMD | 5.25 Lakh |
Tender Value | |
Place | khaltsi |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=34005 |
Start Date | August 03, 2024 15:30 |
End Date |
16/08/2024 ( Expired 277 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreZonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Read moreof your Industry type