Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Bharat Petroleum Corporation Limited (Bpcl Kr) Rfp For Hdpe/Pvc/Cpvc/Upvc Piping Solutions 🛠️ Bharat Petroleum Corporation Limited (Bpcl Kr), A Leading Public Sector Undertaking, Is Issuing A Request For Proposals (Rfp) For A Rate Contract To Supply And Erect/Repair High Density Polyethylene (Hdpe), Polyvinyl Chloride (Pvc), Chlorinated Polyvinyl Chloride (Cpvc), And Unplasticized Polyvinyl Chloride (Upvc) Pipes And Fittings. 📅 Proposal Submission Deadline: May 21, 2024, 2:00 Pm Interested Vendors Must Submit Detailed Proposals, Including Rates, Technical Specifications, And Execution Capabilities, By The Stipulated Deadline. Keywords: Bpcl Kr, Bharat Petroleum Corporation Limited, Rate Contract, Hdpe Pipe, Pvc Pipe, Cpvc Pipe, Upvc Pipe, Piping Solutions, Public Sector Undertaking, Rfp, Procurement| Particulars | Details |
|---|---|
| Title |
Rate Contract For Supply And Erection / Repair Of Hdpe Pipe / Pvc Pipe/ Cpvc/ Upvc Pipes And Fittings At All Facilities Inside Bpcl Kr
|
| Description |
Rate Contract For Supply And Erection / Repair Of Hdpe Pipe / Pvc Pipe/ Cpvc/ Upvc Pipes And Fittings At All Facilities Inside Bpcl Kr
|
| Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_BPCL_16242 |
|
Reference Number |
1000417912 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | As per Tender Document |
| Link |
View Original Tender Notice
https://bpcltenders.eproc.in |
| Start Date | April 29, 2024 22:40 |
| End Date |
Expired
21/05/2024
Expired 878 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Commercial upvc fittings,commercial upvc fittings,commercial upvc fittings,pipe clamps (v2),chlorinated polyvinyl chloride (cpvc) pipes for portable hot and cold water distribution supplies (v3) conforming to is 15778,pipe unions confirming to is 1239 (part 2),cpvc ball valve,cpvc ball valve,commercial upvc fittings,commercial upvc fittings
Commercial upvc fittings,commercial upvc fittings,commercial upvc fittings,pipe clamps (v2),chlorinated polyvinyl chloride (cpvc) pipes for portable hot and cold water distribution supplies (v3) conforming to is 15778,pipe unions confirming to is 1239 (part 2),cpvc ball valve,cpvc ball valve,commercial upvc fittings,commercial upvc fittings
Read moreAnnual procurement of pvc, cpvc, hdpe pipes and electrofusion fittings for water supply works
Annual procurement of pvc, cpvc, hdpe pipes and electrofusion fittings for water supply works
Read moreSupply of pipes, fittings consumables, fabrication, erection, welding, inspection, testing, insulati
Supply of pipes, fittings consumables, fabrication, erection, welding, inspection, testing, insulati
Read moreConstructions of pump house including all pump fittings, wall fittings electrical fittings, upvc underground pipeline for providing lift irrigation facilities to villagesehjo majra, in distt ludhiana from sirhind canal rd 107335r
Constructions of pump house including all pump fittings, wall fittings electrical fittings, upvc underground pipeline for providing lift irrigation facilities to villagesehjo majra, in distt ludhiana from sirhind canal rd 107335r
Read moreConstructions of pump house including all pump fittings, wall fittings electrical fittings, upvc underground pipeline for providing lift irrigation facilities to village macchiwra, in distt ludhiana from sirhind canal rd 119450r.
Constructions of pump house including all pump fittings, wall fittings electrical fittings, upvc underground pipeline for providing lift irrigation facilities to village macchiwra, in distt ludhiana from sirhind canal rd 119450r.
Read moreTaking down of chowkats or frames not exc 1.5 sqm each with shuttersspecified as directed,supply and fixing factory made upvc door frame overall dimension 48x40 mm with wall thickness 2.0 mm m.s. tube of size 19 x 19 mm as specified as directed,providing and fixing factory made upvc with wall thickness of 23mm 02mm as specified as directed,m and l sheet glass 4.8 mm thick ordinary quality and glazing exc 0.50 sqm as specified as directed,taking down steel tubing having bore of pipe 25 to 32 mm as specified as directed,taking down steel tubing having bore of pipe 20 mm and as specified as directed,s and f for 25 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings in trenches completeas specified as directed,supply and fixing for 20 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings on walls or ceiling or all as specified and directed,supply and fixing in repair 18kw steam generator residential steam ers 310 400 cubic feet as specified as directed,supply and fixing in repair 30 kw steam generator p
Taking down of chowkats or frames not exc 1.5 sqm each with shuttersspecified as directed,supply and fixing factory made upvc door frame overall dimension 48x40 mm with wall thickness 2.0 mm m.s. tube of size 19 x 19 mm as specified as directed,providing and fixing factory made upvc with wall thickness of 23mm 02mm as specified as directed,m and l sheet glass 4.8 mm thick ordinary quality and glazing exc 0.50 sqm as specified as directed,taking down steel tubing having bore of pipe 25 to 32 mm as specified as directed,taking down steel tubing having bore of pipe 20 mm and as specified as directed,s and f for 25 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings in trenches completeas specified as directed,supply and fixing for 20 mm outer dia cpvc sdr 11 and plain cpvc sdr 11 fittings on walls or ceiling or all as specified and directed,supply and fixing in repair 18kw steam generator residential steam ers 310 400 cubic feet as specified as directed,supply and fixing in repair 30 kw steam generator p
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type