Tender Details

Particulars Details
Title
General Sr Urgent Construction Of Retaining Wall In Between Km 0/900 1/000 On Vattaparamb Parakanni Village Office Road In Perinthalmanna Lac Urgent Construction Of Retaining Wall General Civil Work
Description
General Sr Urgent Construction Of&Amp#X0d Retaining Wall In Between Km 0/900 1/000 On&Amp#X0d Vattaparamb Parakanni Village Office Road&Amp#X0d In Perinthalmanna Lac Urgent Construction Of&Amp#X0d Retaining Wall General Civil Work
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_795675_1
Reference
Number
PWD/RB/TR/13653/2024_5_1_1/1
Tender Fee 2760
EMD 50000
Tender Value -
Place Perinthalmanna
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1316085

Start Date September 10, 2025 20:30
End Date
Expired 20/09/2025

Expired 390 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Reconstruction of damaged culvert in kizhuparamba nellarkadavu road between 1/900 km and pottammal from kuniyil new bazar in ernad lac

Reconstruction of damaged culvert in kizhuparamba nellarkadavu road between 1/900 km and pottammal from kuniyil new bazar in ernad lac

Read more
Restoration of rain damages on link road massal to parmar basti in km 0/000 to 2/000 in district kangra (hp) (sh-construction of retaining wall and cc pavement in between km at rd 0/765 to 2/000).(4332-1.1)

Restoration of rain damages on link road massal to parmar basti in km 0/000 to 2/000 in district kangra (hp) (sh-construction of retaining wall and cc pavement in between km at rd 0/765 to 2/000).(4332-1.1)

Read more
Installation of crash barrier on ghat section, interlocking blocks, retaining wall and road side drainage on vulnerable location between 0/0 to 66/000 of nh-927a

Installation of crash barrier on ghat section, interlocking blocks, retaining wall and road side drainage on vulnerable location between 0/0 to 66/000 of nh-927a

Read more
Installation of crash barrier on ghat section, interlocking blocks, retaining wall and road side drainage on vulnerable location between 66/000 to 148/0 of nh-927a

Installation of crash barrier on ghat section, interlocking blocks, retaining wall and road side drainage on vulnerable location between 66/000 to 148/0 of nh-927a

Read more
Repair restoration of rain damages on link road harijan basti karluhi athmah road km 000 to 200 sh co retaining wall between rd 1000 to 1050 under pdna 2025

Repair restoration of rain damages on link road harijan basti karluhi athmah road km 000 to 200 sh co retaining wall between rd 1000 to 1050 under pdna 2025

Read more
General budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work

General budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work

Read more
Hyderabad division: sc-mue & jkm-bdhn section :proposed construction of 2 lane robs at (1) lc no.198 at km 482/900-483/000 between indalvai -sirnapalli stations (2) lc no.190a at km 455/200-300 between janakampet - nizamabad stations (3) lc no.18jb at km19/100-200 between janakampet-bodhan stations (4)lc no.209a at km 511/0-100 between uppalavai-kamareddy stations

Hyderabad division: sc-mue & jkm-bdhn section :proposed construction of 2 lane robs at (1) lc no.198 at km 482/900-483/000 between indalvai -sirnapalli stations (2) lc no.190a at km 455/200-300 between janakampet - nizamabad stations (3) lc no.18jb at km19/100-200 between janakampet-bodhan stations (4)lc no.209a at km 511/0-100 between uppalavai-kamareddy stations

Read more
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise