Tender Details

Particulars Details
Title
Mtps 1 Bm Unit Iv Annual Maintenance 2025 26 Hot Primary Air Ducts And Hot Secondary Air Ducts Of A And B Sides Cleaning The Accumulated Ash Arresting The Air Leakage By Rectification Of The Damper And Allied Works
Description
Mtps 1 Bm Unit Iv Annual Maintenance 2025 26 Hot Primary Air Ducts And Hot Secondary Air Ducts Of A And B Sides Cleaning The Accumulated Ash Arresting The Air Leakage By Rectification Of The Damper And Allied Works
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_588903_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT. 199 / 2025-26
Tender Fee 0
EMD 6600
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703529

Start Date August 04, 2025 23:00
End Date
Expired 18/08/2025

Expired 425 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27

Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27

Read more
Dindigul edc - works contract - labour charges for replacement of gasket for arresting heavy oil leakage and hot oil circulation in 16 mva,power transformer -ii at 110/22kv dindigul ss

Dindigul edc - works contract - labour charges for replacement of gasket for arresting heavy oil leakage and hot oil circulation in 16 mva,power transformer -ii at 110/22kv dindigul ss

Read more
Dindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 10mva,110/22 kv power transformer i at 110 / 22 kv kallimandayam ss

Dindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 10mva,110/22 kv power transformer i at 110 / 22 kv kallimandayam ss

Read more
Dindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 16mva,110/22 kv power transformer i at 110/22 kv vedasandur ss

Dindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 16mva,110/22 kv power transformer i at 110/22 kv vedasandur ss

Read more
Ttpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab

Ttpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab

Read more
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during

Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during

Read more
Mtps i bm unit ii annual maintenance 2025 26 hot primary air ducts and hot secondary air ducts of a and b sides cleaning the accumulated ash arresting the air leakage by rectification of the damper and ducts etc

Mtps i bm unit ii annual maintenance 2025 26 hot primary air ducts and hot secondary air ducts of a and b sides cleaning the accumulated ash arresting the air leakage by rectification of the damper and ducts etc

Read more
Cleaning of the accumulated ash inside hot and cold primary air ducts

Cleaning of the accumulated ash inside hot and cold primary air ducts

Read more
Cleaning of the accumulated ash inside hot and cold primary air ducts

Cleaning of the accumulated ash inside hot and cold primary air ducts

Read more
Rectification of ash leakage 12 mtr elevation

Rectification of ash leakage 12 mtr elevation

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise