Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Consultancy Services For Assisting Authoritys Engineer For Supervision Of Construction Of Tadipatri Bypass From Km 0/000 To Km 6/285 Of 4 Lane On Nh67 In Ananthapuramu District In The State Of Andhra Pradesh On Epc Mode Under Annual Plan 2022 23.
|
Description |
Consultancy Services For Assisting Authoritys Engineer For Supervision Of Construction Of Tadipatri Bypass From Km 0/000 To Km 6/285 Of 4 Lane On Nh67 In Ananthapuramu District In The State Of Andhra Pradesh On Epc Mode Under Annual Plan 2022 23.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_817677_1 |
Reference Number |
NIT No.05/AEE/SE,NH,ATP/2024-25, Dt. 08.07.2024 |
Tender Fee | 5900 |
EMD | 0 |
Tender Value | |
Place | Tadipatri bypass from Km 0/000 to Km 6/285 of NH67 |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=859348 |
Start Date | July 23, 2024 00:25 |
End Date |
22/08/2024 ( Expired 316 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConsultancy services for authority engineer for supervision of widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreConsultancy services for preparation of dpr for the work construction of 4 lane bypass to mahabubnagar town from km 275.350 of nh 167 to km 13.285 of nh 167n in the state of telangana
Consultancy services for preparation of dpr for the work construction of 4 lane bypass to mahabubnagar town from km 275.350 of nh 167 to km 13.285 of nh 167n in the state of telangana
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreof your Industry type