Tender Details
Particulars | Details |
---|---|
Title |
Const Of Cover Drain With Pcc Road From House Of Bhutnath Ghosh To Panchanan Ghosh At Fatepur.
|
Description |
Const Of Cover Drain With Pcc Road From House Of Bhutnath Ghosh To Panchanan Ghosh At Fatepur.
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2025_ZPHD_821412_1 |
Reference Number |
99/LKGP/2025 |
Tender Fee | 2000 |
EMD | 13100 |
Tender Value | |
Place | Fatepur. |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1827354 |
Start Date | February 28, 2025 21:30 |
End Date |
07/03/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.
Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreConstruction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Read moreConsultancy services for preparation of detailed project report for upgradation of 2 lane with paved shoulder to 4 lane with paved shoulder from akaltara to rengalpali_odisha border _from km 151.450 to km 276.786 including bilaspur bypass total lengt
Consultancy services for preparation of detailed project report for upgradation of 2 lane with paved shoulder to 4 lane with paved shoulder from akaltara to rengalpali_odisha border _from km 151.450 to km 276.786 including bilaspur bypass total lengt
Read moreSpecial repair at vulnerable locations from km 284 0 to 286 0 on nh 05 in the state of himachal pradesh
Special repair at vulnerable locations from km 284 0 to 286 0 on nh 05 in the state of himachal pradesh
Read moreE-bids for engineering, procurement and construction (epc) for supply, erection and commissioning of 3000 tcd (expandable to 4900 tcd) sugar mill plant with civil works along with operation and maintenance of sugar mill at chhata, district mathura
E-bids for engineering, procurement and construction epc for supply erection and commissioning of 3000 tcd expandable to 4900 tcd sugar mill plant with civil works along with operation and maintenance of sugar mill at chhata, district mathura
Read moreConstr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Constr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Read moreConstr/impvt of road birdhwal-puggal-bajju between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc
Constr/impvt of road b-p-b between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreof your Industry type