Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Supply Of Ballast For Railway Track Construction 🛤️🏗️ Ircon International Limited, A Public Sector Undertaking, Is Seeking Bids For The Supply Of 50 Mm (65mm To 20mm Well Graded) Machine Crushed Stone Ballast As Per Rdso Specifications For The Construction Of A Broad Gauge (Bg) Spur Line At Nischintapur Yard, Agartala. 📅 Bid Submission Deadline: July 10, 2024, 3:00 Pm Tender Fee: Inr 5000 Emd: Inr 87000 Interested Bidders Must Possess The Capability To Manufacture, Supply, And Stack The Ballast As Required. Proposals Should Include Detailed Plans For The Supply Chain, Adherence To Specifications, And A Timeline For Project Completion. Keywords: Ballast Supply, Railway Track Construction, Ircon International Limited, Public Sector Undertaking, Rdso Specifications, Tender, Bid, Agartala| Particulars | Details |
|---|---|
| Title |
Supply Of Ballast
|
| Description |
Manufacturing, Supplying And Stacking Of 50 Mm (65mm To 20mm Well Graded) Size Machine Crushed Stone Ballast For Railway Track As Per Relevant Rdso Specification At Nischintapur Yard For Construction Of Bg Spur Line
|
| Organisation | IRCON International Limited | Public Sector Undertakings |
| Tender Id | 2024_IRCON_199600_1 |
|
Reference Number |
IRCON/2056/AANRLP/ Tender/Ballast for spur line/ 276 |
| Tender Fee | 5000 |
| EMD | 87000 |
| Tender Value | - |
| Place | Agartala |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218502 |
| Start Date | July 04, 2024 14:30 |
| End Date |
Expired
10/07/2024
Expired 831 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chennai central- gudur section - development of ballast depot for increasing the ballast capacity at dvr(doravarichatram) in aden/sullurpetta subdivision
Chennai central- gudur section - development of ballast depot for increasing the ballast capacity at dvr(doravarichatram) in aden/sullurpetta subdivision
Read moreMonitoring health of ballast bed with the help of ground penetration radar technology for through ballast renewal (tbr) and formation rehabilitation on indian railways
Monitoring health of ballast bed with the help of ground penetration radar technology for through ballast renewal (tbr) and formation rehabilitation on indian railways
Read moreCollection and training out of track ballast at wki depot.
Collection and training out of track ballast at wki depot.
Read moreSupply of 124000 cum stone ballast (machine crushed) 65 mm gauge and loading the same into railway wagons/hoppers at ballast depot manheru, under control of aden/bhiwani.
Supply of 124000 cum stone ballast (machine crushed) 65 mm gauge and loading the same into railway wagons/hoppers at ballast depot manheru, under control of aden/bhiwani.
Read moreSalem division-development of existing ballast depots at uttukuli (ukl) & mallur (malr).
Salem division-development of existing ballast depots at uttukuli (ukl) & mallur (malr).
Read moreSupply & stacking of 65 mm gauge machine crushed stone ballast & loading in to hopper s / bob n wagon s by mechanical means at jamdha ballast depot. quantity = 1,00,000 m3.
Supply & stacking of 65 mm gauge machine crushed stone ballast & loading in to hopper s / bob n wagon s by mechanical means at jamdha ballast depot. quantity = 1,00,000 m3.
Read moreRajkot division : supplying and loading of 131670 cum ballast into wagons at wankaner.
Rajkot division : supplying and loading of 131670 cum ballast into wagons at wankaner.
Read moreNanded division: ak-pau section: supplying and stacking of 50 mm gauge hard and durable machine crushed stone ballast at bolda(blc)ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/pau s jurisdiction for completion period 30 (thirty months( including (03)three months mobilization period).
Nanded division: ak-pau section: supplying and stacking of 50 mm gauge hard and durable machine crushed stone ballast at bolda(blc)ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/pau s jurisdiction for completion period 30 (thirty months( including (03)three months mobilization period).
Read moreNanded division: mmr-mue section: supplying and stacking of 50 mm gauge hard and durable machine crushed stone ballast at jalna (j)ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/j s jurisdiction for completion period 30 (thirty months( including (03)three months mobilization period).
Nanded division: mmr-mue section: supplying and stacking of 50 mm gauge hard and durable machine crushed stone ballast at jalna (j)ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/j s jurisdiction for completion period 30 (thirty months( including (03)three months mobilization period).
Read moreBallast collecting sheet lhs, confirming to plasser part no. 354.034.0065, acceptable make:- plasser or equivalent.
Ballast collecting sheet lhs, confirming to plasser part no. 354.034.0065, acceptable make:- plasser or equivalent.
Read moreof your Industry type