Tender Details

Particulars Details
Title
Lap Inguinal Hernia Mesh For Left Side Medium Size
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/4439864
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date January 24, 2024 19:46
End Date
Expired 03/02/2024

Expired 942 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 1 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Navy

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 C P THAKKAR AND COMPANY (PHARMA) LIMITED Make : MERIL Model : FILAPROP 3D MESH Title : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE 28-01-2024 16:23:55 MII Disqualified
2 GEN WORLD MEDICAL DEVICES Make : medtronic Model : DXT1510AL Title : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE 02-02-2024 19:19:23 MII Qualified
3 LIFE TECH BIO Make : Medtronics India Model : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE Title : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE 02-02-2024 22:57:40 MII Qualified
4 MEDI-TECH PRODUCT SOLUTIONS Make : BARD INDIA HEALTCARE PVT LTD Model : 3DMAX LARGE LEFT MESH Title : 3DMAX LARGE LEFT MESH 02-02-2024 19:57:02 MII Disqualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 GEN WORLD MEDICAL DEVICES Item Categories : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE 98802.00 L1
2 LIFE TECH BIO Item Categories : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE 108000.00 L2
Similar Tenders
Cleaning obstruction of submergence area at right and left side of shelgaon barrage medium project on tapi river

Cleaning obstruction of submergence area at right and left side of shelgaon barrage medium project on tapi river

Read more
Annual maintenance of the road kallambella to hosamallenahalli via maralappanahalli from ch 0.00-2.70km, 3.00-4.00, & 7.00-15.00km for the year 2026-27(total length 15.00km from ch-0.00-15.00, over lap 0.60km)

Annual maintenance of the road kallambella to hosamallenahalli via maralappanahalli from ch 0.00-2.70km, 3.00-4.00, & 7.00-15.00km for the year 2026-27(total length 15.00km from ch-0.00-15.00, over lap 0.60km)

Read more
Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28

Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28

Read more
Advance pitting work at rampura sy no, 68 for 25 ha and raising of 10x16 size seedlings in kushtagi range during 2026-27

Advance pitting work at rampura sy no, 68 for 25 ha and raising of 10x16 size seedlings in kushtagi range during 2026-27

Read more
Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna

Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna

Read more
Construction of 80m long gravity retaining wall for landslide portion due to heavy rains on right side of mundgod-anashi road (sh-46) between ch.113.50 km to 113.70km in joida taluk, uttara kannada district.

Construction of 80m long gravity retaining wall for landslide portion due to heavy rains on right side of mundgod-anashi road (sh-46) between ch.113.50 km to 113.70km in joida taluk, uttara kannada district.

Read more
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years

Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise