Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lap Inguinal Hernia Mesh For Left Side Medium Size
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4439864 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 24, 2024 19:46 |
| End Date |
Expired
03/02/2024
Expired 942 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | C P THAKKAR AND COMPANY (PHARMA) LIMITED | Make : MERIL Model : FILAPROP 3D MESH Title : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE | 28-01-2024 16:23:55 | MII | Disqualified |
| 2 | GEN WORLD MEDICAL DEVICES | Make : medtronic Model : DXT1510AL Title : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE | 02-02-2024 19:19:23 | MII | Qualified |
| 3 | LIFE TECH BIO | Make : Medtronics India Model : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE Title : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE | 02-02-2024 22:57:40 | MII | Qualified |
| 4 | MEDI-TECH PRODUCT SOLUTIONS | Make : BARD INDIA HEALTCARE PVT LTD Model : 3DMAX LARGE LEFT MESH Title : 3DMAX LARGE LEFT MESH | 02-02-2024 19:57:02 | MII | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | GEN WORLD MEDICAL DEVICES | Item Categories : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE | 98802.00 | L1 |
| 2 | LIFE TECH BIO | Item Categories : LAP INGUINAL HERNIA MESH FOR LEFT SIDE MEDIUM SIZE | 108000.00 | L2 |
Cleaning obstruction of submergence area at right and left side of shelgaon barrage medium project on tapi river
Cleaning obstruction of submergence area at right and left side of shelgaon barrage medium project on tapi river
Read moreAnnual maintenance of the road kallambella to hosamallenahalli via maralappanahalli from ch 0.00-2.70km, 3.00-4.00, & 7.00-15.00km for the year 2026-27(total length 15.00km from ch-0.00-15.00, over lap 0.60km)
Annual maintenance of the road kallambella to hosamallenahalli via maralappanahalli from ch 0.00-2.70km, 3.00-4.00, & 7.00-15.00km for the year 2026-27(total length 15.00km from ch-0.00-15.00, over lap 0.60km)
Read moreOperation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28
Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28
Read moreAdvance pitting work at rampura sy no, 68 for 25 ha and raising of 10x16 size seedlings in kushtagi range during 2026-27
Advance pitting work at rampura sy no, 68 for 25 ha and raising of 10x16 size seedlings in kushtagi range during 2026-27
Read moreConstruction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna
Construction work including hdpe pipe line motor pump rcc sump etc. for discharging rain water from all water logging area of institute campus into municipal corporation north and east side drain at igims, patna
Read moreConstruction of 80m long gravity retaining wall for landslide portion due to heavy rains on right side of mundgod-anashi road (sh-46) between ch.113.50 km to 113.70km in joida taluk, uttara kannada district.
Construction of 80m long gravity retaining wall for landslide portion due to heavy rains on right side of mundgod-anashi road (sh-46) between ch.113.50 km to 113.70km in joida taluk, uttara kannada district.
Read moreComprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type