Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Resistor S & Capacitors As Per Mentioned In Annexure T1.
|
Description |
Supply Of Resistor S & Capacitors As Per Mentioned In Annexure T1.
|
Organisation | Electronics Corporation of India Limited | Public Sector Undertakings |
Tender Id | TCD-06192316 |
Reference Number |
TCD-06192316 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | HYDERABAD |
Link | https://etenders.ecil.co.in/eps/rfq/nitPublishAnonymous.do?nitId=1014851 |
Start Date | August 21, 2024 19:23 |
End Date |
10/09/2024 ( Expired 288 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreImplementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Read moreCs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode
Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation and commissioning of portable ultrasound system for gmch, smch, lmch, dmch, jmch, faamch and tmch in assam
Supply, installation and commissioning of portable ultrasound system for gmch, smch, lmch, dmch, jmch, faamch and tmch in assam&#x0d
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode
Construction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode
Read moreDevelopment of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Development of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Read moreof your Industry type