Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Both Side Guard Wall With Bed Lining From Rd 5240.00 Mtr. To 5305.00 Mtr. And Bed Lining From Rd 5305.00 Mtr. To 5685.00 Mtr. Of Bugbuga Distributary For The Year 2025 26
|
| Description |
Construction Of Both Side Guard Wall With Bed Lining From Rd 5240.00 Mtr. To 5305.00 Mtr. And Bed Lining From Rd 5305.00 Mtr. To 5685.00 Mtr. Of Bugbuga Distributary For The Year 2025 26
|
| Organisation | CE-BM,UM Basin,Burla | State Govt. and UT |
| Tender Id | 2025_CEBBU_112939_1 |
|
Reference Number |
BID-01(25 OF 44)/25-26 |
| Tender Fee | 4000 |
| EMD | 5924 |
| Tender Value | - |
| Place | BURLA |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=538007 |
| Start Date | May 01, 2025 16:30 |
| End Date |
Expired
08/05/2025
Expired 522 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of final drive gear box assembly and mounting (both side) of beas drill sl no. 201310195 and repairing of levelling jack pads( both side), stem wrench and dust collector of kansabati drill sl. no. 201510206.
Repairing of final drive gear box assembly and mounting (both side) of beas drill sl no. 201310195 and repairing of levelling jack pads( both side), stem wrench and dust collector of kansabati drill sl. no. 201510206.
Read moreCorridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.
Corridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.
Read moreSrlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.
Srlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.
Read moreEstimate for mastic asphalt road( bitumen) and both side rcc drain from sarai more to sanjay saree centre , in ward no-26 , under nagar nigam sasaram rohtas district
Estimate for mastic asphalt road( bitumen) and both side rcc drain from sarai more to sanjay saree centre , in ward no-26 , under nagar nigam sasaram rohtas district
Read moreDismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area
Dismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area
Read moreConstruction of both side guard wall with bed lining from rd 3550.00 mtr. to 3618.00 mtr. and construction of bed lining from rd 3618.00 mtr. to 3698.00 mtr. of bugbuga distributary for the year 2025-26
Construction of both side guard wall with bed lining from rd 3550.00 mtr. to 3618.00 mtr. and construction of bed lining from rd 3618.00 mtr. to 3698.00 mtr. of bugbuga distributary for the year 2025-26
Read moreConstruction of right side guard wall with bed lining from rd 2768.00 mtr. to 2900.00 mtr. of bugbuga distributary for the year 2025-26
Construction of right side guard wall with bed lining from rd 2768.00 mtr. to 2900.00 mtr. of bugbuga distributary for the year 2025-26
Read moreConstruction of both side guard wall with bed lining from rd 4571.00 mtr. to 4751.00 mtr. of bugbuga distributary off-taking at rd 15666.00 mtr. (l) of attabira branch canal for the year 2024-25
Construction of both side guard wall with bed lining from rd 4571.00 mtr. to 4751.00 mtr. of bugbuga distributary off-taking at rd 15666.00 mtr. (l) of attabira branch canal for the year 2024-25
Read moreConstruction of right-side guard wall with bed lining in between rd 2458m to 2687m, rd 2750m to 2760m and both side guard wall with bed lining in-between rd 2740m to rd 2750m of bugbuga distributary for the year 2026-27
Construction of right-side guard wall with bed lining in between rd 2458m to 2687m, rd 2750m to 2760m and both side guard wall with bed lining in-between rd 2740m to rd 2750m of bugbuga distributary for the year 2026-27
Read moreConstruction of both side guard wall with bed lining from rd 983.00 mtr. to 1036.00 mtr. and construction of bed lining from rd 1036.00 mtr. to 1111.00 mtr. of barhamunda distributary for the year 2025-26
Construction of both side guard wall with bed lining from rd 983.00 mtr. to 1036.00 mtr. and construction of bed lining from rd 1036.00 mtr. to 1111.00 mtr. of barhamunda distributary for the year 2025-26
Read moreof your Industry type