Tender Details

Particulars Details
Title
Restoration Of Slide Portion At Rd 4.40 Km On Mashka Pepri Road Of Sewa Ii Power Station Mashka (J And K) (Cw 687)
Description
Restoration Of Slide Portion At Rd 4.40 Km On Mashka Pepri Road Of Sewa Ii Power Station Mashka (J And K) (Cw 687)
Organisation NHPC Limited | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 590
EMD 40000
Tender Value
Place Sewa-II Power Station, Mashka, District-Kathua
Link

AAAAAAAAAA

Login to view
Start Date July 03, 2025 23:30
End Date

18/07/2025 ( 14 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of hl bridge (3 span 11.00 m each eff) on khalchian drain in village kang on khadoor sahib tarn taran road at rd 9300 mtr including approaches and di package on pb-22-015-a under pmgsy iii batch ii for the year 2023-24 scheme

Construction of hl bridge (3 span 11.00 m each eff) on khalchian drain in village kang on khadoor sahib tarn taran road at rd 9300 mtr including approaches and di package on pb-22-015-a under pmgsy iii batch ii for the year 2023-24 scheme

Read more
Repair and restoration of all field hostels with pvc lining and tile work around guest house and exe. field hostel at sewa-ii power station maska (j and k) (cw-683)

Repair and restoration of all field hostels with pvc lining and tile work around guest house and exe. field hostel at sewa-ii power station maska (j and k) (cw-683)

Read more
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)

Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(4th call)

Read more
Execution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti

Execution of supply of ready mix concrete (batching plant within 10.00 km from site) by transit mixture/fiorie and concrete pump including pouring at construction of 2 lane r.o.b. 198b on between station basti-orwara in distt- basti

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise