Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mastic Flooring Work (Mastic Work At Juction Point Block A And B Phase Ii) Noida
|
| Description |
Mastic Flooring Work (Mastic Work At Juction Point Block A And B Phase Ii) Noida
|
| Organisation | New Okla Industrial Development Authority | State Govt. and UT |
| Tender Id | 2024_NOIDA_881495_1 |
|
Reference Number |
45/DGM/SM/WC-7/ET/2023-24 |
| Tender Fee | 5310 |
| EMD | 2.99 Lakh |
| Tender Value | - |
| Place | NOIDA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1506838 |
| Start Date | January 16, 2024 19:30 |
| End Date |
Expired
22/01/2024
Expired 954 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Raising of monsoon plantation work under encroachment evicted forest area at kanur b no cxxxvi-6 fsno-209 (10ha), kanur fsno-241/a (10ha), mavinmane fsno-62 (10ha), (total 30ha) in idagundi range during 2026-27
Raising of monsoon plantation work under encroachment evicted forest area at kanur b no cxxxvi-6 fsno-209 (10ha), kanur fsno-241/a (10ha), mavinmane fsno-62 (10ha), (total 30ha) in idagundi range during 2026-27
Read moreMastic flooring work (mastic work at juction point block-a and b phase-2) noida
Mastic flooring work (mastic work at juction point block-a and b phase-2) noida
Read moreMastic flooring work (dbm, bc and mastic work from irrigation drain to india tv, sector-85) noida
Mastic flooring work (dbm, bc and mastic work from irrigation drain to india tv, sector-85) noida
Read moreStrengthening of road (resurfacing and mastic flooring work in sector-67) noida.
Strengthening of road (resurfacing and mastic flooring work in sector-67) noida.
Read moreStrengthening of road (maintenance of footpath work at block-a and b phase-ii) noida
Strengthening of road (maintenance of footpath work at block-a and b phase-ii) noida
Read moreMastic flooring work (providing and laying bituminous mastic work on sector-112, 113, 115, 117, 118 and 120 xing), noida
Mastic flooring work (providing and laying bituminous mastic work on sector-112, 113, 115, 117, 118 and 120 xing), noida
Read moreMastic flooring work (p/l mastic flooring and bc patch work on garhi gol chakkar and crossing at fng road in wc-4 area), noida.
Mastic flooring work (p/l mastic flooring and bc patch work on garhi gol chakkar and crossing at fng road in wc-4 area), noida.
Read moreMastic flooring work (p/l mastic flooring over crossing on 30.00m wide road and gate no.-1, 2, 3, 4 sector-69), noida.
Mastic flooring work (p/l mastic flooring over crossing on 30.00m wide road and gate no.-1, 2, 3, 4 sector-69), noida.
Read moreStrengthening of road (p/l dgbm, b.c. and mastic flooring work in sector-68) noida
Strengthening of road (p/l dgbm, b.c. and mastic flooring work in sector-68) noida
Read moreStrengthening of road (construction of rcc footpath, interlocking tile work and drain work at juction point along dsc road greenbelt block-b hosiery complex) noida
Strengthening of road (construction of rcc footpath, interlocking tile work and drain work at juction point along dsc road greenbelt block-b hosiery complex) noida
Read moreof your Industry type