Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of The New Temple At Vadadla Village, Taluka Mehmdabad, Dist. Kheda Area, In Connection With Mumbai Ahmedabad High Speed Rail Project.
|
Description |
Construction Of The New Temple At Vadadla Village, Taluka Mehmdabad, Dist. Kheda Area, In Connection With Mumbai Ahmedabad High Speed Rail Project.
|
Organisation | National High Speed Rail Corporation Limited | Public Sector Undertakings |
Tender Id | 2025_NHSRC_224621_1 |
Reference Number |
NHSRCL/BRC/2025/01 |
Tender Fee | 5900 |
EMD | 37549 |
Tender Value | |
Place | Vadodara |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=251197 |
Start Date | February 06, 2025 14:30 |
End Date |
13/02/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of consultant for independent safety assessment (isa) of mumbai-ahmedabad high speed rail (mahsr) project
Selection of consultant for independent safety assessment (isa) of mumbai-ahmedabad high speed rail (mahsr) project
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreRepair/ replacement of lt panel and allied works in bhagat line and south area under age e/m (es) at ge (u) meerut cantt.
Repair/ replacement of lt panel and allied works in bhagat line and south area under age e/m (es) at ge (u) meerut cantt.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreSitc of lightning protection system at behala govt polytechnic
Construction of partly g 4 partly g 8 storied building civil work, sanitary plumbing work, fire protection system including internal electrification work for proposed new govt. polytechnic at behala in kmc area ward no. 132 sitc of lightn
Read moreConstruction of rcc circular tank 2.72 lakhs litres with pump house alongwith 15hp pump at new pahargaon, satellite quarter at prothrapur in ward no.20, birsha nagar ward no. 18, birjgunj in ward no.22, mahaveer nagar tank compound, bird.........
Construction of rcc circular tank 2.72 lakhs litres with pump house alongwith 15hp pump at new pahargaon, satellite quarter at prothrapur in ward no.20, birsha nagar ward no. 18, birjgunj in ward no.22, mahaveer nagar tank compound, bird.........
Read moreConstruction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreof your Industry type