Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Solenoid Coil Conforming To Woodward
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106385392 |
|
Reference Number |
10240756 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/072024/106385392/viewNitPdf_4616108.pdf |
| Start Date | June 24, 2024 16:08 |
| End Date |
Expired
05/07/2024
Expired 786 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of coil tubing and pumping services (with equipment) for wss, mumbai for a period 03 years
Hiring of coil tubing and pumping services (with equipment) for wss, mumbai for a period 03 years
Read moreProcurement of 33,000 nos. of 15mm dia multi jet class b magnetic type water meters conforming to is 779/1994 or iso 4064/2014 with its latest amendments.-ez
Procurement of 33,000 nos. of 15mm dia multi jet class b magnetic type water meters conforming to is 779/1994 or iso 4064/2014 with its latest amendments-ez
Read moreMaintenance of pathappanagudi to ap border road (sh 243l) from km 0.00 to 3.31 in chalakere taluk and maintenance of chalakere to vishwanathanahalli road (sh-243) km 0.00 to 2.40, km 7.00 to 13.10, km 15.50 to 19.80, km 22.00 to 23.00, km 28.00 to 31.00, km 34.65 to 41.95, km 42.70 to 43.07, km 50.47 to 69.07, km 73.07 to 75.33, km 76.10 to 76.135 and km 79.99 to 84.40 in chalakere taluk
Maintenance of pathappanagudi to ap border road (sh 243l) from km 0.00 to 3.31 in chalakere taluk and maintenance of chalakere to vishwanathanahalli road (sh-243) km 0.00 to 2.40, km 7.00 to 13.10, km 15.50 to 19.80, km 22.00 to 23.00, km 28.00 to 31.00, km 34.65 to 41.95, km 42.70 to 43.07, km 50.47 to 69.07, km 73.07 to 75.33, km 76.10 to 76.135 and km 79.99 to 84.40 in chalakere taluk
Read moreImp. dev. of back lanes by pdg. rmc from h.no. cu-32 to 13, 65 to 53, 53 to 78, 79 to 91, 79 to 104, 162 to 163, 162 to 143, 105 to 124, 118, 52 to ndpl and front lane cu-79 to 66 in cu-block, pitampura, ward-57/kpz.
Imp. dev. of back lanes by pdg. rmc from h.no. cu-32 to 13, 65 to 53, 53 to 78, 79 to 91, 79 to 104, 162 to 163, 162 to 143, 105 to 124, 118, 52 to ndpl and front lane cu-79 to 66 in cu-block, pitampura, ward-57/kpz.
Read moreAnnual maintenance of highway sh-222 connecting chitradurga to machenahalli ap border via gonur belaghatta haikal manumaihnahatty on sh45 nayakanahatty on sh45 mallurahally on sh65 surammanahalli on sh65 siddayyanakote rayapura molakalmuru on nh544dd hanagal on nh150a nagasamudra siddapura km 57.20 to 58.67, 60.14 to 62.34, 63.81 to 70.40,71.43 to 71.56, 71.67 to 72.50,73.38 to 74.00,74.45 to 79.90, 81.80 to 85.78, 87.05 to 91.60, 92.39 to 94.02 and 97.18 to 108.73 in molakalmuru taluk
Annual maintenance of highway sh-222 connecting chitradurga to machenahalli (ap border) via gonur, belaghatta, haikal, manneborana hatty, bosedevarahatty, manumaihnahatty (on sh45), nayakanahatty (on sh45), mallurahally, mustalagummi (on sh65), surammanahalli (on sh65), harvinadoddi, chikkobanahalli, chikkumthi, siddayyanakote, yerrenahalli,rayapura, sulenahalli, molakalmuru (on nh544dd), haralayya, hanagal (on nh150a), katanaykanahalli, byrapura, nagasamudra, siddapura km 57.20 to 58.67, 60.14 to 62.34, 63.81 to 70.40,71.43 to 71.56, 71.67 to 72.50,73.38 to 74.00,74.45 to 79.90, 81.80 to 85.78, 87.05 to 91.60, 92.39 to 94.02 and 97.18 to 108.73 in molakalmuru taluk.
Read moreAnnual maintenance of a)myaklurahalli to challakere road via myaklurahalli, gannayanakanahalli, kariobanahalli, mallappanahalli, salabommanahalli, vaddikere, m.d.kote road from km 0.00 to 4.25, 7.17to7.95, 8.15 to 13.75, 14.00 to 16.00, 16.40 to 16.80, 17.20 to 17.87, 18.35 to 19.40, 19.90 to 21.60, 23.22 to 23.60 and 24.47 to 25.67 km in hiriyur taluk, b)doddasiddavvanahalli to sanikere road via doddasiddavvanahalli,j.n.kote, kalliroppa, sondekere road from km 16.36 to 17.21 km in hiriyur taluk
Annual maintenance of a) myaklurahalli to challakere road via myaklurahalli, gannayanakanahalli, kariobanahalli, mallappanahalli, salabommanahalli, vaddikere, m.d.kote road from km 0.00 to 4.25, 7.17 to 7.95, 8.15 to 13.75, 14.00 to 16.00, 16.40 to 16.80, 17.20 to 17.87, 18.35 to 19.40, 19.90 to 21.60, 23.22 to 23.60 and 24.47 to 25.67 km in hiriyur taluk, b) doddasiddavvanahalli to sanikere road via doddasiddavvanahalli, j.n.kote, kalliroppa, sondekere road from km 16.36 to 17.21 km in hiriyur taluk
Read moreAnnual maintenance of a) lakshmipura to kasturirangappanahalli road via boranakunte, gorladaku road from km 0.00 to 11.80 km in hiriyur taluk, b) kasturirangappanahalli to pitlali road from 0.00 to 0.30, 4.00 to to 5.40 and 6.70 to 7.96 km in hiriyur taluk
Annual maintenance of a) lakshmipura to kasturirangappanahalli road via boranakunte, gorladaku road from km 0.00 to 11.80 km in hiriyur taluk, b) kasturirangappanahalli to pitlali road from 0.00 to 0.30, 4.00 to to 5.40 and 6.70 to 7.96 km in hiriyur taluk
Read moreAnnual maintenance to road from huildore to tavarekere from ch 0.00 to 3.00, 5.00 to 10.00 and 12.00 to 13.80 km in sira taluk for the year 2026-27
Annual maintenance to road from huildore to tavarekere from ch 0.00 to 3.00, 5.00 to 10.00 and 12.00 to 13.80 km in sira taluk for the year 2026-27
Read moreof your Industry type