Tender Details

Particulars Details
Title
Construction Work Of C.C. Road From Deepak Dhawan House To Kapil Shop In Ward No. 24, Mohalla Sadar Bazaar.
Description
Construction Work Of C.C. Road From Deepak Dhawan House To Kapil Shop In Ward No. 24, Mohalla Sadar Bazaar.
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id 2025_DOLBU_1011291_1
Reference
Number
15UT2 - 14
Tender Fee 320
EMD 5417
Tender Value
Place KALPI
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1814983
Start Date February 25, 2025 23:30
End Date

19/03/2025 ( Expired 7 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Read more
Construction of 4 laning in realignment stretch from km 561.200 to km 563.055 (peddasettipalli village) of hubli krishnapatnam road nh-67 in state of andhra pradesh

Construction of 4 laning in realignment stretch from km 561/200 to km 563/055 (peddasettipalli village) of hubli krishnapatnam road nh-67 in state of andhra pradesh

Read more
Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc

Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Read more
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.

Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)

Read more
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.

Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise