Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Coal Haul Road With Side Drain From Junction To Near Central Sump At Kanchan Open Cast Mine Under Nowrozabad Sub Area Of Johilla Area.
|
Description |
Repairing Of Coal Haul Road With Side Drain From Junction To Near Central Sump At Kanchan Open Cast Mine Under Nowrozabad Sub Area Of Johilla Area.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_331788_1 |
Reference Number |
SECL/JHL/S.O.(C)/ eNIT-109/24-25/931 dt. 08.03.2025 |
Tender Fee | 0 |
EMD | 99900 |
Tender Value | |
Place | SECL JOHILLA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343931 |
Start Date | March 11, 2025 15:30 |
End Date |
27/03/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of drain near coal mines from isai mohalla to kripal chowk main road at giriraj kishor kapoor ward under zone no. 3.
Construction of drain near coal mines from isai mohalla to kripal chowk main road at giriraj kishor kapoor ward under zone no. 3.
Read moreConstruction of pcc road widening and rcc drain with precast from saroj shah house to main road at ward no.30
Construction of pcc road widening and rcc drain with precast from saroj shah house to main road at ward no.30
Read moreLoading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Read moreUpgradation of rural road from bakultala junction to shyamkund at rangat north and middle andaman under pmgsy-iii batch-i, 2024-25.
Upgradation of rural road from bakultala junction to shyamkund at rangat north and middle andaman under pmgsy-iii batch-i, 2024-25.
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreMtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Read moreof your Industry type