Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Unit V Replacement Of Pulverized Coal Pipes, Bends And Fittings Between Mill And Upto 32 Mtr Level Of Boiler Area During The Forthcoming Overhaul
|
Description |
Ttps Operation Circle Mpm Ii Unit V Replacement Of Pulverized Coal Pipes, Bends And Fittings Between Mill And Upto 32 Mtr Level Of Boiler Area During The Forthcoming Overhaul
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_559057_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.117/25-26 |
Tender Fee | 0 |
EMD | 20600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=667694 |
Start Date | May 17, 2025 18:30 |
End Date |
02/06/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v
Read moreTtps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Read moreTtps es circle em iii unit v replacing the existing damaged steel wire mesh in pa fan motor 4a 4b and 5b fd motor 4a id motor 5b and coal mill motor 4a and 5a in unit 4 and 5.
Ttps es circle em iii unit v replacing the existing damaged steel wire mesh in pa fan motor 4a 4b and 5b fd motor 4a id motor 5b and coal mill motor 4a and 5a in unit 4 and 5.
Read moreTtps es circle em iii unit v replacing the coal mill motor 5e sl no 188040 by a spare coal mill motor sl no 32260 a401 04 10 in unit 5 boiler area and overhauling released the coal mill motor sl no 188040
Ttps es circle em iii unit v replacing the coal mill motor 5e sl no 188040 by a spare coal mill motor sl no 32260 a401 04 10 in unit 5 boiler area and overhauling released the coal mill motor sl no 188040
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreTtps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Read moreTtps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Ttps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Read moreTtps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Read moreTtps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Read moreof your Industry type