Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rob In Lieu Of Lc 47 At Km 1062/7 8 (Composite Girder) Between Ratikheda Shadora Section Of Bhopal Division On West Central Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 76717918 |
|
Reference Number |
BPL-C-II-ROB-LC47-09-2024 |
| Tender Fee | 0 |
| EMD | 5.41 Lakh |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76717918/viewNitPdf_4672968.pdf |
| Start Date | September 07, 2024 18:47 |
| End Date |
Expired
30/09/2024
Expired 745 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreConstruction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreRehabilitation, special strengthening and repair of bridges work. (package-1 bhopal) (i) special strengthening of rob in lieu of lc 237 budhni, dist sehore (ii) renewal/strengthening of approach road high level bridge across narmada river near anwali
Rehabilitation, special strengthening and repair of bridges work. (package-1 bhopal)
Read moreConstruction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read more(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
Read more1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreof your Industry type