Overhauling Of Generator, Conducting Tests For Rla/Condition Assessment Of Generator, Servicing Of Governing Rack And Associated Works Of Unit 1, Unit 2 Unit 3 (210 Mw Each) At Dvc Mejia, West Bengal Consists Of Job A I.E. For U 1, Job B I.E. For U
|
| Description |
Overhauling Of Generator, Conducting Tests For Rla/Condition Assessment Of Generator, Servicing Of Governing Rack And Associated Works Of Unit 1, Unit 2 Unit 3 (210 Mw Each) At Dvc Mejia, West Bengal Consists Of Job A I.E. For U 1, Job B I.E. For U
|
| Organisation | Bharat Heavy Electricals Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_BHEL_761325_1 |
|
Reference Number |
PSER-PUR-MJA-S561-24 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | UNIT-1, UNIT-2 - UNIT-3 (210 MW EACH) AT DVC MEJIA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1064878 |
| Start Date | June 22, 2024 23:00 |
| End Date |
Expired
25/06/2024
Expired 742 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Overhauling of generator, conducting tests for rla/condition assessment of generator, servicing of governing rack and associated works of unit 1,2,3 (210 mw each) at dvc mejia, west bengal.
Overhauling of generator, conducting tests for rla condition assessment of generator, servicing of governing rack and associated works of unit 1, unit 2 and unit 3, 210 mw each at dvc mejia, west bengal consists of job-a job-b job-c and job-d as reqd
Read moreSlip ring in-situ machining and polishing of generator rotor of unit-1, 210 mw at mejia tps, dvc, west bengal.
Slip ring in-situ machining and polishing of generator rotor of unit-1, 210 mw at mejia tps, dvc, west bengal.
Read moreSlip ring in-situ machining and polishing of generator rotor of unit-2, 210 mw at mejia tps, dvc, west bengal.
Slip ring in-situ machining and polishing of generator rotor of unit-2, 210 mw at mejia tps, dvc, west bengal.
Read moreCapital overhauling of generator of u-04, 210 mw at ktps-wbpdcl, west bengal.
Capital overhauling of generator of u-04, 210 mw at ktps-wbpdcl, west bengal.
Read moreCapital overhauling of generator of u-04, 210 mw at ktps-wbpdcl, west bengal.
Capital overhauling of generator of u-04, 210 mw at ktps-wbpdcl, west bengal.
Read moreShifting of new generator stator from unloading bay -1 to unloading bay -3 and shifting of the existing stator to unloading bay -1 of 210 mw unit (thw set) at mejia tps, dvc, west bengal.
Shifting of new generator stator from unloading bay -1 to unloading bay -3 and shifting of the existing stator to unloading bay -1 of 210 mw unit (thw set) at mejia tps, dvc, west bengal.
Read moreDeputation of expert for calibration and checking of probes/sensors (shinkawa-make) including controllers installed at unit-3, 210 mw (kwu design), mejia tps, dvc, west bengal.
Deputation of expert for calibration and checking of probes/sensors (shinkawa-make) including controllers installed at unit-3, 210 mw (kwu design), mejia tps, dvc, west bengal.
Read moreDeputation of expert for calibration and checking of probes/sensors (shinkawa-make) including controllers installed at unit-3, 210 mw (kwu design), mejia tps, dvc, west bengal.
Deputation of expert for calibration and checking of probes/sensors (shinkawa-make) including controllers installed at unit-3, 210 mw (kwu design), mejia tps, dvc, west bengal.
Read moreConducting residual life assessment rla study of 210 mw boiler unit iii of mettur thermal power station i during overhaul 2025_26
Conducting residual life assessment rla study of 210&#x0d mw boiler unit iii of mettur thermal power station i&#x0d during overhaul 2025_26
Read moreConducting residual life assessment rla study of 210 mw boiler unit i of mettur thermal power station i during overhaul 2025_ 26
Conducting residual life assessment rla study of 210 mw boiler unit i of mettur thermal power station i during overhaul 2025_ 26
Read moreof your Industry type