Tender Details
Particulars | Details |
---|---|
Title |
Electrical Work In Connection With Up Gradation/Modernization Of Infrastructure Of Goods Shed At Mukutban, Tadali, Chandrapur And Ballarshah Stations Of Ngp Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78833420 |
Reference Number |
NGP-L-2024-T-30 |
Tender Fee | 0 |
EMD | 2.25 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78833420/viewNitPdf_4795813.pdf |
Start Date | December 07, 2024 00:46 |
End Date |
03/01/2025 ( Expired 125 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read morePerformance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreof your Industry type