Tender Details
Particulars | Details |
---|---|
Title |
Supply Of 350 Nb Seamless Pipe Astm A106 Gr B With Suitable M S Coupling For Ash Slurry Disposal Lines Of Unit Iv
|
Description |
Supply Of 350 Nb Seamless Pipe Astm A106 Gr B With Suitable M S Coupling For Ash Slurry Disposal Lines Of Unit Iv
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_445287_1 |
Reference Number |
CE/TTPS/3452-S |
Tender Fee | 0 |
EMD | 23800 |
Tender Value | |
Place | CE/TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=530257 |
Start Date | March 08, 2024 22:30 |
End Date |
25/03/2024 ( Expired 439 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
04/25-26 - rate contract of drilling of 125mm (m s pipe) nominal diameter bore hole for hand pumps and installation of india mark-ii hand pump in combination strata complete with material and labour charges in div. dholpur of district dholpur (urban
Rate contract of drilling of 125mm (m s pipe) nominal diameter bore hole for hand pumps and installation of india mark-ii hand pump in combination strata complete with material and labour charges in div. dholpur of district dholpur (urban/rural).
Read more03/25-26 - rate contract of drilling of 125mm (m s pipe) nominal diameter bore hole for hand pumps and installation of india mark-ii hand pump in combination strata complete with material and labour charges in div. bari of district dholpur (urban/rur
Rate contract of drilling of 125mm (m s pipe) nominal diameter bore hole for hand pumps and installation of india mark-ii hand pump in combination strata complete with material and labour charges in div. bari of district dholpur (urban/rural).
Read moreSupply of body plate with supporting channels for unit iv scrapper conveyor feeder 4b2
Supply of body plate with supporting channels for unit iv scrapper conveyor feeder 4b2
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreEngagement of supply labours for carpentry work and sewerage lines of plant including regular cleaning of toilets of ash slurry pump house,
Engagement of supply labours for carpentry work and sewerage lines of plant
 including regular cleaning of toilets of ash slurry pump house, 24x7 store and
 dumping of rubbish and waste materials into nearby dustbin at btps, bokaro
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreSupply of single sleeve type gear coupling with finished bore and key way duly dynamically balanced suitable for voith model no.1150 svnl 21 18 5t for id fan input side hbk 180 1 no
Supply of single sleeve type gear coupling with finished bore and key way duly dynamically balanced suitable for voith model no.1150 svnl 21 18 5t for id fan input side hbk 180 1 no
Read moreof your Industry type