Tender Details

Particulars Details
Title
Shifting Of Existing Water Supply Pipeline From Dokmardi Fly Over Bridge To Athola Ugsr (Balance Work)
Description
Shifting Of Existing Water Supply Pipeline From Dokmardi Fly Over Bridge To Athola Ugsr (Balance Work)
Organisation UT Administration of Dadra and Nagar Haveli | State Govt. and UT
Tender Id 2025_UTDNH_7532_1
Reference
Number
E TENDER NOTICE NUMBER 02 OF 2025-2026
Tender Fee 1000
EMD 1.39 Lakh
Tender Value -
Place DNH
Link
View Original Tender Notice

https://dnhtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=7720

Start Date April 15, 2025 23:00
End Date
Expired 30/04/2025

Expired 532 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Relocation or shifting of existing iocl vasco goa white oil pipeline to mormugao port authority berth number 8

Relocation or shifting of existing iocl vasco goa white oil pipeline to mormugao port authority berth number 8

Read more
Shifting of departmental pipe line and replacement of air valve near lalgarh railway over bridge under phed pdr sub dn ist bikaner

Shifting of departmental pipe line and replacement of air valve near lalgarh railway over bridge under phed pdr sub dn ist bikaner

Read more
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.

Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.

Read more
Balance work of major bridge on well foundation over river gomti on nh 128a (parallel to shastri bridge) in jaunpur city in the state of uttar pradesh on epc mode

Balance work of major bridge on well foundation over river gomti on nh 128a (parallel to shastri bridge) in jaunpur city in the state of uttar pradesh on epc mode

Read more
Deposit southern railway doubling of railway track utility shifting at kunjalammoodu re alignment of existing sewer main line from chainage 222200 to chainage 222300 and laying of di k9 pipe through the proposed railway over bridge at kunjalammoodu

Deposit southern railway doubling of railway track utility shifting at kunjalammoodu re alignment of existing sewer main line from chainage 222200 to chainage 222300 and laying of di k9 pipe through the proposed railway over bridge at kunjalammoodu

Read more
Na...m and r to ratnagiri water supply scheme (mirjole block).. shifting of existing consumer water supply connections from old water distribution pipeline to new 300 mm di pipeline from j.k files to gadre marine pvt. ltd.

Na...m and r to ratnagiri water supply scheme (mirjole block).. shifting of existing consumer water supply connections from old water distribution pipeline to new 300 mm di pipeline from j.k files to gadre marine pvt. ltd.

Read more
Construction of fly over bridge in rewa city from college chouraha (infront of commissioner banglow) to dhekha tiraha (infront of hotel vishnu empire) on varanasi-nagpur road distt. rewa in epc mode

Construction of fly over bridge in rewa city from college chouraha (infront of commissioner banglow) to dhekha tiraha (infront of hotel vishnu empire) on varanasi-nagpur road distt. rewa in epc mode

Read more
Shifting of existing clear water main of size 700mm ac to 711 mm ms pipe for a length of 458m from vilankurichi bsr under cwsss to clpra with pillur reservoir as a source due to construction of road over bridge of thaneerpandal road deposit work

Shifting of existing clear water main of size 700mm ac to 711 mm ms pipe for a length of 458m from vilankurichi bsr under cwsss to clpra with pillur reservoir as a source due to construction of road over bridge of thaneerpandal road deposit work

Read more
Shifting of 3p 3w 11kv line at kalunga due to construction of h l bridge over lingara river on angul mahidharpur pwd road godisahi to khamar bauligarh rd road under bantala section

Shifting of 3p 3w 11kv line at kalunga due to construction of h l bridge over lingara river on angul mahidharpur pwd road godisahi to khamar bauligarh rd road under bantala section

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise