Tender Details

About Tender

🏙️ Invitation For Bids: Advanced Fstp Design And Implementation 🚿 The Municipal Affairs Department Of A State Government/Ut Invites Bids From Experienced Contractors For The Design, Supply, Installation, And Testing Of A 30 Kld Capacity Faecal Sludge Treatment Plant (Fstp) Based On Enhanced Digestion And Multi Stage Bio Reactor (Edmsb) Technology. The Solution Should Integrate Bio Treatment With Moving Bed Biofilm Reactor (Mbbr) Technology And A Lamella Clarifier, Along With All Necessary Civil And Mechanical Works. 📅 Bid Submission Deadline: April 13, 2024, 5:00 Pm Bid Security: Inr 200,000 Interested Bidders Must Demonstrate Expertise In Wastewater Treatment Technologies And Provide A Detailed Proposal, Including Technical Specifications, Cost Estimates, And Project Timelines. Keywords: Fstp, Edmsb Technology, Mbbr, Lamella Clarifier, Wastewater Treatment, Municipal Affairs Department, State Government/Ut, Durgapur Municipal Corporation, Bid Opportunity
Particulars Details
Title
Design, Supply, Installation And Testing Of A 30 Kld Capacity Fstp Based On Enhanced Digestion And Multi Stage Bio Reactor (Edmsb) Technology Approach Combining Bio Treatment With Mbbr Technology And Lamella Clarifier With All Civil ,Mechanical And
Description
Design, Supply, Installation And Testing Of A 30 Kld Capacity Fstp Based On Enhanced Digestion And Multi Stage Bio Reactor (Edmsb) Technology Approach Combining Bio Treatment With Mbbr Technology And Lamella Clarifier With All Civil ,Mechanical And
Organisation MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT
Tender Id 2024_MAD_668240_1
Reference
Number
WBDMC/DRGSW/NIT-65/23-24 (2ND Call)
Tender Fee 0
EMD 2 Lakh
Tender Value
Place DURGAPUR MUNICIPAL CORPORATION
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1450324
Start Date February 17, 2024 00:25
End Date

13/04/2024 ( Expired 373 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design supply installation testing and commissioning of 50 kld sewage treatment plant with membrane bio reactor technology on turnkey basis

Design supply installation testing and commissioning of 50 kld sewage treatment plant with membrane bio reactor technology on turnkey basis

Read more
Maintenance of a-14, kalkaji extension flats.sh_operation and comprehensive maintenance of sewage treatment plant of capacity 1850 kld based on moving bed bio-reactor (mbbr) technology at a-14, kalkaji extension flats.

Maintenance of a-14, kalkaji extension flats.sh_operation and comprehensive maintenance of sewage treatment plant of capacity 1850 kld based on moving bed bio-reactor (mbbr) technology at a-14, kalkaji extension flats.

Read more
Installation of a 10 kld capacity faecal sludge and septage treatment plant with 5 year om based on tiger bio-filter technology at bhuri gp, under the galsi ii panchayat samiti, purb bardhaman district

Installation of a 10 kld capacity faecal sludge and septage treatment plant with 5 year om based on tiger bio-filter technology at bhuri gp, under the galsi ii panchayat samiti, purb bardhaman district

Read more
Supply, installation, testing, commissioning (sitc) of 30 kld sewage treatment system, moving bed bio reactor (mbbr) technology with subsidiary work (house hold connection, manhole, pipeline etc.) and operation & maintenance of the total system in chiria township of manoharpur ore mines, bsl, sail.

Supply, installation, testing, commissioning (sitc) of 30 kld sewage treatment system, moving bed bio reactor (mbbr) technology with subsidiary work (house hold connection, manhole, pipeline etc.) and operation & maintenance of the total system in chiria township of manoharpur ore mines, bsl, sail.

Read more
Design and build 2000 kld capacity zero liquid discharge (zld) based common effluent treatment plant (cetp)with 5 years of operation and maintenance on dbo basis at sipcot industrial park, perundurai, erode district, tamil nadu

Design and build 2000 kld capacity zero liquid discharge (zld) based common effluent treatment plant (cetp)with 5 years of operation and maintenance on dbo basis at sipcot industrial park, perundurai, erode district, tamil nadu

Read more
Supply, fabrication, installation, testing and commissioning of semi-automatic sewage treatment plant based on soil bio technology process with sewage handling capacity 50kld per day. all the equipment, piping, pumps, electrical panel and special med

Supply, fabrication, installation, testing and commissioning of semi-automatic sewage treatment plant based on soil bio technology process with sewage handling capacity 50kld per day. all the equipment, piping, pumps, electrical panel and special med

Read more
Installment of faecal sludge and septage treatment plant of 20 kld capacity based on enhanced digestion and multistage bioreactor edmsb for shyampur i and adjacent development block howrah district west bengal under sbm g of rs 21027749 and procure

Installment of faecal sludge and septage treatment plant of 20 kld capacity based on enhanced digestion and multistage bioreactor edmsb for shyampur i and adjacent development block howrah district west bengal under sbm g of rs 21027749 and procure

Read more
Installation of a 10 kld capacity faecal sludge and septage treatment plant with 5 year om based on tiger bio-filter technology at bhuri gp under the galsi ii panchayat samiti, purb bardhaman district

Installation of a 10 kld capacity faecal sludge and septage treatment plant with 5 year om based on tiger bio-filter technology at bhuri gp under the galsi ii panchayat samiti, purb bardhaman district

Read more
Supply and installation of effluent cum sewage treatment plant based on double stage mbbr-uv treatment facility at central hospital dhori, dhori area (including operation and maintenance of the stp plant/sewerage network with all required t and p, c

Supply and installation of effluent cum sewage treatment plant based on double stage mbbr-uv treatment facility at central hospital dhori, dhori area (including operation and maintenance of the stp plant/sewerage network with all required t and p, c

Read more
Supply, fabrication, installation, testing and commissioning of semi-automatic sewage treatment plant based on soil bio technology process with sewage handling capacity 50kld per day. all the equipment, piping, pumps, electrical panel and special med

Supply, fabrication, installation, testing and commissioning of semi-automatic sewage treatment plant based on soil bio technology process with sewage handling capacity 50kld per day. all the equipment, piping, pumps, electrical panel and special med

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise