Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pucca Drain From The Koley Para Icds To Saraswati River At Noapara
|
| Description |
Construction Of Pucca Drain From The Koley Para Icds To Saraswati River At Noapara
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_583025_6 |
|
Reference Number |
505-10/BOINCHIPOTA/2023/TIED |
| Tender Fee | 250 |
| EMD | 2400 |
| Tender Value | - |
| Place | G P Office |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | October 03, 2023 22:25 |
| End Date |
Expired
13/10/2023
Expired 1096 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cement concrete road and pucca drain at nabagram para kumarpara starting from the ho tapan pal upto ho sanjoy pal in ward no 29 under cmc
Construction of cement concrete road and pucca drain at nabagram para kumarpara starting from the ho tapan pal upto ho sanjoy pal in ward no 29 under cmc
Read moreConstruction of rcc foot bridge over deo river on the proposed road from gachirampara phc to lalitcharan para, gachirampara under r.d. kanchanpur sub division during the year 2026-27 2nd call.
Foot bridge
Read moreFdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Fdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreConstruction of rcc drain from h/o avijit koley towards saraswati river
Construction of rcc drain from h/o avijit koley towards saraswati river
Read moreConstruction of pucca drain from h/o madan koley to koley para tube well at thakuranichak
Construction of pucca drain from h/o madan koley to koley para tube well at thakuranichak
Read moreConstruction of r.c.c bridge at noapara village over saraswati river connecting boinchipota g.p. under singur block
Construction of r.c.c bridge at noapara village over saraswati river connecting boinchipota g.p. under singur block
Read moreConstruction of pucca drain from dilip koley godown to dhibar para at dakshinkul
Construction of pucca drain from dilip koley godown to dhibar para at dakshinkul
Read moreConstruction of concrete drain from uttar para icds towards ajit koley house at tirol
Construction of concrete drain from uttar para icds towards ajit koley house at tirol
Read moreof your Industry type