Tender Details

Particulars Details
Title
Construction Of Gate At Balawali Kiratpur Nehtaur Chandpur Feena Road (Mdr 170 W) On Uttar Pradesh And Uttarakhand Border In Distt Bijnor
Description
Construction Of Gate At Balawali Kiratpur Nehtaur Chandpur Feena Road (Mdr 170 W) On Uttar Pradesh And Uttarakhand Border In Distt Bijnor
Organisation Chief Engineer Moradabad Zone PWD Moradabad UP | State Govt. and UT
Tender Id 2025_CEMBD_1039875_1
Reference
Number
3076/E-Tender-Rampur Circle/25-26 Dt. 13.05.2025
Tender Fee 2354
EMD 5.1 Lakh
Tender Value
Place Bijnor
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1885791
Start Date May 19, 2025 15:30
End Date

24/05/2025 ( Expired 27 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode

Construction of additional lanes to act as truck parking/lay bye in sohagi ghat stretch on mangawan to mp/up border section of nh-30 in the state of madhya pradesh on epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise