Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Jijgaon To Jhadpa Via Sindhkheda Road Length 8.00 Km Pac Rs. 895.08 Lacs 4th Call On Road And Bridge Sor 25.03.22 Work Period 300 Days
|
| Description |
Construction Of Jijgaon To Jhadpa Via Sindhkheda Road Length 8.00 Km Pac Rs. 895.08 Lacs 4th Call On Road And Bridge Sor 25.03.22 Work Period 300 Days
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_300262_1 |
|
Reference Number |
42/ G. /1/Mis/C.Z./2019 (Year 2023) |
| Tender Fee | 20000 |
| EMD | 8.95 Lakh |
| Tender Value | |
| Place | Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | September 02, 2023 00:25 |
| End Date |
Expired
23/09/2023
Expired 1014 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreSupply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44
Read moreConstruction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreConstruction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs first call on road and bridge sor 25.03.22 work period 300 days
Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs first call on road and bridge sor 25.03.22 work period 300 days
Read moreConstruction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs second call on road and bridge sor 25.03.22 work period 300 days
Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs second call on road and bridge sor 25.03.22 work period 300 days
Read moreConstruction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs third call on road and bridge sor 25.03.22 work period 300 days
Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs third call on road and bridge sor 25.03.22 work period 300 days
Read moreConstruction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs fourth call on road and bridge sor 25.03.22 work period 330 days
Construction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs fourth call on road and bridge sor 25.03.22 work period 330 days
Read moreConstruction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs first call on road and bridge sor 25.03.22 work period 330 days
Construction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs first call on road and bridge sor 25.03.22 work period 330 days
Read moreof your Industry type