Tender Details

Particulars Details
Title
Construction Of Jijgaon To Jhadpa Via Sindhkheda Road Length 8.00 Km Pac Rs. 895.08 Lacs 4th Call On Road And Bridge Sor 25.03.22 Work Period 300 Days
Description
Construction Of Jijgaon To Jhadpa Via Sindhkheda Road Length 8.00 Km Pac Rs. 895.08 Lacs 4th Call On Road And Bridge Sor 25.03.22 Work Period 300 Days
Organisation Government of Madhya Pradesh
Tender Id 2023_PWDRB_300262_1
Reference
Number
42/ G. /1/Mis/C.Z./2019 (Year 2023)
Tender Fee 20000
EMD 8.95 Lakh
Tender Value
Place Bhopal
Link
View Original Tender Notice

https://mptenders.gov.in

Start Date September 02, 2023 00:25
End Date
Expired 23/09/2023

Expired 1014 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)

Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, &#x0d (length - 27.00 km)&#x0d

Read more
Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44

Supply and stacking of coarse sand (dry) for permanent works and supply and stacking of sand/stone dust (dry) for gsb and wmm works and coarse sand (dry) for sand blanketing work between km 0.00 to km 13.00 on road area tremple-chu jn area flat-pt 44

Read more
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Read more
Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs first call on road and bridge sor 25.03.22 work period 300 days

Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs first call on road and bridge sor 25.03.22 work period 300 days

Read more
Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs second call on road and bridge sor 25.03.22 work period 300 days

Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs second call on road and bridge sor 25.03.22 work period 300 days

Read more
Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs third call on road and bridge sor 25.03.22 work period 300 days

Construction of jijgaon to jhadpa via sindhkheda road length 8.00 km pac rs. 895.08 lacs third call on road and bridge sor 25.03.22 work period 300 days

Read more
Construction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs fourth call on road and bridge sor 25.03.22 work period 330 days

Construction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs fourth call on road and bridge sor 25.03.22 work period 330 days

Read more
Construction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs first call on road and bridge sor 25.03.22 work period 330 days

Construction of dhurgada jijgaon sindhkheda balagaon road length 12.00 km under mandi nidhi fund pac rs. 1016.47 lacs first call on road and bridge sor 25.03.22 work period 330 days

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise