Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Weighing Balance
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5191913 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 22, 2024 21:30 |
| End Date |
Expired
13/08/2024
Expired 672 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ACZET PRIVATE LIMITED | Make : ACZET Model : CY 224A Title : Weighing Balance | 13-08-2024 09:35:02 | MSE | Disqualified |
| 2 | ADVANCE QUALITY TRADERS | Make : Sartorius Model : BSA224S-CW Title : Analytical Semi-Micro Balance | 12-08-2024 16:41:15 | N/A | Qualified |
| 3 | AXISCAL INSTRUMENTS PRIVATE LIMITED | Make : Shimadzu Model : ATX 224R Title : Weighing Balance | 12-08-2024 16:39:41 | N/A | Disqualified |
| 4 | BIKASH SCIENTIFIC INSTRUMENTS PRIVATE LIMITED | Make : SARTORIUS Model : BCE224i 10IN Title : Analytical Balance | 09-08-2024 11:37:15 | N/A | Disqualified |
| 5 | BLSINDIA | Make : Surplus Model : MAB220 Title : Weighing Balance | 22-07-2024 18:28:32 | N/A | Qualified |
| 6 | M/S SCIENTIFIC BUSSINESS SYSTEMS | Make : SCALETEC Model : CWS 15.1SL Title : Weighing Scale | 12-08-2024 11:23:10 | N/A | Disqualified |
| 7 | M/S SUPREME CHEMICAL & INSTRUMENTS | Make : Aczet Pvt ltd. Model : CY-224A Title : Weighing balance | 12-08-2024 15:03:09 | N/A | Disqualified |
| 8 | OMEGA CORPORATION | Make : CONTECH Model : CAI-234 Title : FLAMEPROOF BALANCE | 12-08-2024 17:23:51 | N/A | Disqualified |
| 9 | RIDHRANSH INSTRUMENTS INDIA PRIVATE LIMITED | Make : ACZET Model : ACZET CY 224C (220g) Title : ACZET CY 224C (220g) | 23-07-2024 15:18:53 | N/A | Disqualified |
| 10 | THE ENGINEERING SCIENCE APPARATUS WORKSHOP | Make : SARTORIOUS Model : BCE224 Title : SARTORIOUS Weighing Balance | 13-08-2024 09:35:47 | N/A | Disqualified |
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | BLSINDIA | Item Categories : Weighing Balance | 100714.73 | L1 |
| 2 | ADVANCE QUALITY TRADERS | Item Categories : Weighing Balance | 167868.52 | L2 |
Moei and fans, rmo pump sets i/c compound lights at type v quarter at safdarjung development area, new delhi
Ei works in servant quarter and other balance work
Read moreConstruction of dvor building at rupsi airport. sh civil and internal electrification work balance works
Construction of dvor building at rupsi airport. sh civil and internal electrification work balance works
Read moreDevelopment of ultra modern...
Development of ultra modern apple, fruit and vegetable market at pinjore (phase-ii) balance road work
Read moreInternal bituminous road and repair to road side drains in kendriya vidyalaya ordnance factory ambazari nagpur sh balance work.
Read moreConstruction of english medium college at old central jail premises, agartala, tripura, during the year 2026-27 sh balance portion building portion including internal water supply, sanitary installation, sewage and drainage works
Construction of english medium college at old central jail premises, agartala, tripura, during the year 2026-27 sh balance portion building portion including internal water supply, sanitary installation, sewage and drainage works
Read moreDnit for laying of balance connecting 100mm, 150mm and 200mm i/d d.i. pipe in place of existing damaged/irreparable a.c. pipe, construction of sluice valve haus in village kulasi and all other works contingent thereto.
Dnit for laying of balance connecting 100mm, 150mm and 200mm i/d d.i. pipe in place of existing damaged/irreparable a.c. pipe, construction of sluice valve haus in village kulasi and all other works contingent thereto.
Read moreBalance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Balance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Read moreConstruction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Read moreConstruction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 2 nos. company level bop at simna-ii and old sewaram para including internal electrification, installation i/c compound lights service connecton to buildings. (package-ii) (balance work)
Read moreBalance works for providing of following fire safety equipments for the esic hospital, gorimedu, puducherry. part-a- providing addressable intelligent fire alarm system with connected allied works. part-b- providing photo luminescent exit signages with connected allied works etc., part- c- providing emergency evacuation pa system with connected allied works etc., part-d- providing iei fans with connected allied works for fire pump room.
Read moreof your Industry type