Tender Details

Particulars Details
Title
Kiifb Widening Of Vazhayila Pazhakutty Pwd Road Utility Shifting
Description
Kiifb Deposit Work Under Krfb Kiifb Widening Of Vazhayila Pazhakutty Pwd Road Utility Shifting Laying New Transmission Main Along Both Sides Of The New Road And Connected Works Reach 1 From Vazhayila To Keltron Jn Pipeline Work
Organisation Kerala Water Authority | State Govt. and UT
Tender Id 2024_KWA_695257_1
Reference
Number
08/2024-25/KWA/PHC/D3/TVM
Tender Fee 9759
EMD 1 Lakh
Tender Value
Place Vazhayila
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1083710

Start Date October 08, 2024 22:30
End Date
Expired 15/10/2024

Expired 644 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota

Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota

Read more
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.

Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.

Read more
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Kiifb deposit work under krfb/kiifb widening of vazhayila pazhakutty pwd road-utility shifting laying of 300 mm d i pumping main along pipeline road at keltron jn reach 1pipeline work

Kiifb deposit work under krfb/kiifb widening of vazhayila pazhakutty pwd&amp#x0d road-utility shifting laying of 300 mm d i pumping main along pipeline road at keltron jn reach 1pipeline work&amp#x0d

Read more
Utility shifting

Utility shifting from vazhayila junction to karakulam palam in connection with pwd road widening

Read more
Kiifb-widening of sreekrishnapuram

Kiifb-widening of sreekrishnapuram&amp#x0d muriyamkkanni- chethalloor pwd road from&amp#x0d muriyamkanni to poovathani - utility shifting -&amp#x0d shifting of kwa pipe line.

Read more
O and m water supply schemes-kiifb-utility shifting-district court bridge widening-replacing and laying -kiifb-utility shifting-district court bridge widening-replacing and laying-pipeline work

O and m water supply schemes-kiifb-utility shifting-district court bridge widening-replacing and laying -kiifb-utility shifting-district court bridge widening-replacing and laying-pipeline work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise