Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit Iv Aoh 2024 25 Flue Gas Duct A And B Sides Patch Up Works And Other Repair Works Between Aph Out Let To Esp Inlet
|
| Description |
Mtps I Bm Unit Iv Aoh 2024 25 Flue Gas Duct A And B Sides Patch Up Works And Other Repair Works Between Aph Out Let To Esp Inlet
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_461453_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/BM/ OT. 55 /2024-25 |
| Tender Fee | 0 |
| EMD | 12100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548401 |
| Start Date | July 09, 2024 17:30 |
| End Date |
Expired
15/07/2024
Expired 822 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Procurement of 100 nb ms pipes to replace damaged bracing pipes in both unit boiler ducts (aph, esp and id fan inlet/outlet ducts) in aoh at stpp, jaipur, mancherial, telangana
Read moreProcurement of 8 mm thick ms plate as per is 2062 for unit ii esp inlet duct
Procurement of 8 mm thick ms plate as per is 2062 for unit ii esp inlet duct
Read moreSupply of 10 mm thick m s plate as per is 2062 for unit iv air preheater esp columns and flue gas duct
Supply of 10 mm thick m s plate as per is 2062 for unit iv air preheater esp columns and flue gas duct
Read moreTtps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreTtps mech ii bm unit i rectification of supporting structure of aph duct hopper area reconditioning of eroded portion of primary secondary air damper duct and manhole doors
Ttps mech ii bm unit i rectification of supporting structure of aph duct hopper area reconditioning of eroded portion of primary secondary air damper duct and manhole doors
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - bmd1 3x210 mw atps anpara sonebhadra up repairing replacement of various expansion joints of flue gas duct just above and below aph hot pa duct and sa duct of unit 02 ..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - bmd1 3x210 mw atps anpara sonebhadra up repairing replacement of various expansion joints of flue gas duct just above and below aph hot pa duct and sa duct of unit 02 ..
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Mtps i bm unit ii boiler pressure parts aoh 2026 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreof your Industry type