Tender Details
Particulars | Details |
---|---|
Title |
Bucket Small Or Medium 1,Bucket Big 2,Bathroom Mug 3,Liquid Hand Wash With Holder 4,Hanger For Towe
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5918238 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 06, 2025 21:22 |
End Date |
27/02/2025 ( Expired 53 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreFull port ball valve 1 by 2 inch with push plate for eye or face wash fountain,push plate for eye w
Read more
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&#x0d (6) cylinder with brass line
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreDisposable type respirator with valve 3 m brand or venus or msn as per is: 9473/2002 amndt.1.
For complete deion and other details, please refer to tender
Read moreSelection of operator for operation and maintenance of 04 nos. lct jetties viz. 1. bamanpukur and 2.majherpara, 3. gadkhali, 4. gosaba and 03 nos. lct vessels in minakha, basanti and gosaba block under wbstc
Selection of operator &#x0d for &#x0d operation and maintenance of 04 nos. lct jetties viz. 1. bamanpukur and 2.majherpara, 3. gadkhali, 4. gosaba and 03 nos. lct vessels in minakha, basanti and gosaba block under wbstc
Read moreProcurement of hanger block for bolster suspension of m/coach. to icf drg no. emu/m-0-5-006, alt- s/2 (small- s/2) & rdso s str no.c-k-202.amendment slip no.1 of aug.2002.etc
For complete deion and other details, please refer to tender
Read moreSelection of contractor to implement integrated s.w.m. services on o/m basis of upsida i.a. sahibabad site-4, gzb on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement basis).
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida i.a. sahibabad site-4, gzb on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement basis).
Read moreAmc of electrical maintenance of esp foph and chimney u 1 and 2 300mw and u 3 and 4 500mw etp for two 02 years
Amc of electrical maintenance of esp foph and chimney u 1 and 2 300mw and u 3 and 4 500mw etp for two 02 years
Read moreof your Industry type