Tender Details

Particulars Details
Title
Strengthening Of Existing Kutcha Drain Along Main Haul Road In Between Over Bridge To Old Weigh Bridge North Side Of Haul Road Under Rocp.
Description
Strengthening Of Existing Kutcha Drain Along Main Haul Road In Between Over Bridge To Old Weigh Bridge North Side Of Haul Road Under Rocp.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 48100
Tender Value
Place Rajmahal OCP
Link

AAAAAAAAAA

Login to view
Start Date July 04, 2025 00:25
End Date

14/07/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening

Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)

Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000

Read more
Providing and laying of precast interlocking concrete blocks including wmm layers between km 59.000 to km 69.970 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh

Providing and laying of precast interlocking concrete blocks including wmm layers between km 59.000 to km 69.970 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh

Read more
Construction work of damaged drain by rcc on left side of road from ambedkar square to meghdoot culvert via reserve police line gate no. 01 in ward no. 32.

Construction work of damaged drain by rcc on left side of road from ambedkar square to meghdoot culvert via reserve police line gate no. 01 in ward no. 32.

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26

Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26

Read more
Construction of cc road and drain in ward no 02 from rewa main road to advocate shivkumar sharma house

Construction of cc road and drain in ward no 02 from rewa main road to advocate shivkumar sharma house

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise