Tender Details

Particulars Details
Title
Double Legged Chain Sling With One Ring And Two Hooks.,Double Legged Rope Sling
Description
Organisation COAL INDIA LIMITED | Ministry of Coal
Tender Id GEM/2025/B/6114383
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date April 10, 2025 23:58
End Date

02/05/2025 ( Expired 64 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Details
Name: Aditya Dinkar Pawar
Address: Aditya Dinkar Pawar,[email protected],SECL KUSMUNDA AREA,Korba,CHHATTISGARH,495454,India,--
Ministry: Ministry Of Coal
Department: Coal India Limited
Organisation: South Eastern Coalfields Limited
Office Address: Secl Bilaspur Chhattisgarh
Similar Tenders
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Hiring services of one no. brand new mahindra scorpio classic s 2wd bs6 2.0 model base model with driver and all fittings and accessories for a period of 4 years for telecom and instrumentation section, pump station 3, jorhat.

Hiring services of one no. brand new mahindra scorpio classic s 2wd bs6 2.0 model base model with driver and all fittings and accessories for a period of 4 years for telecom and instrumentation section, pump station 3, jorhat.

Read more
Provn of 02 x double att room with bathroom and toilets facility for single offrs sukna mil stn under ge sukna

Provn of 02 x double att room with bathroom and toilets facility for single offrs sukna mil stn under ge sukna

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Read more
Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode

Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode

Read more
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
33 kv double circuit un-galvanized steel lattice structure 42 feet long along with 3 nos. 33 kv cross arms (channel) and 48 nos. m. s. bolt with nuts complete package

33 kv double circuit un-galvanized steel lattice structure 42 feet long along with 3 nos. 33 kv cross arms (channel) and 48 nos. m. s. bolt with nuts complete package

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise