Tender Details

Particulars Details
Title
Ratlam Improvement To Satellite Depot Of Track Machine. ( Composite Civil Electrical )
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75515004
Reference
Number
RTM-2024-25-56
Tender Fee 0
EMD 2.43 Lakh
Tender Value
Place Mumbai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75515004/viewNitPdf_4595286.pdf
Start Date June 08, 2024 19:04
End Date

01/07/2024 ( Expired 340 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

Read more
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

Read more
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

Read more
One-time improvement to the bypassed stretches of nh 216 from km 50.100 to 51.040 (yendapalli village limits), km 51.761 to 52.421 (penduru village limits), km.63.800 to 65.000 (machilipatnam town limits), km 161.900 to km 162.200 (yazili re

One-time improvement to the bypassed stretches of nh 216 from km 50.100 to 51.040 (yendapalli village limits), km 51.761 to 52.421 (penduru village limits), km.63.800 to 65.000 (machilipatnam town limits), km 161.900 to km 162.200 (yazili re

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
One time improvement from km 26.800 to km 28.000 of nh-104 (new nh-227) ( total length 1.300 km) for the fy 2023_24 in state of bihar.

One time improvement from km 26.800 to km 28.000 of nh-104 (new nh-227) ( total length 1.300 km) for the fy 2023_24 in state of bihar.

Read more
Lac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work

Very&amp#x0d pathetic condition due to waterlogged area .this&amp#x0d estimate is proposed to upgrade the road&amp#x0d with 100 mm interlocking tile works and&amp#x0d provisions for earth filling, gsb, wmm,pcc ,&amp#x0d dr masonary and naming board are inluded in&amp#x0d this estimate.

Read more
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work

Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work

Read more
Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk

Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise