Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Ashing And Burn Off Chamber Furnace Along With Amc For 5 Years After Warranty Period
|
| Description |
|
| Organisation | GAIL India Limited | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5358553 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 11, 2024 23:58 |
| End Date |
Expired
03/10/2024
Expired 745 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Custom bid for services - non -comprehensive amc for high temperature sintering furnace for three years
Custom bid for services - non -comprehensive amc for high temperature sintering furnace for three years
Read more[1] adult patient simulator. as per attached specification. [2] cmc charges for the five [5] years after expiry of two [2] years warranty period.
[1] adult patient simulator. as per attached specification. [2] cmc charges for the five [5] years after expiry of two [2] years warranty period.
Read more[1] high end microdebrider with microdrill. as per attached specification. [2] cmc charges for five (5) years after expiry of two (2) years warranty period.
[1] high end microdebrider with microdrill. as per attached specification. [2] cmc charges for five (5) years after expiry of two (2) years warranty period.
Read moreSupply, installation and commissioning of computerized dv test bench as perenclosed specifications & comprehensive annual maintenance contract for computerized dv test bench with a warranty of two years and comprehensive annual maintenance contract for a period of 5 years after completion of warranty period of two years. (rate for comprehensive annual maintenance contract for a period of 5 years after completion of warranty period of two years to be quoted separately apart from rate of comput
Supply, installation and commissioning of computerized dv test bench as perenclosed specifications & comprehensive annual maintenance contract for computerized dv test bench with a warranty of two years and comprehensive annual maintenance contract for a period of 5 years after completion of warranty period of two years. (rate for comprehensive annual maintenance contract for a period of 5 years after completion of warranty period of two years to be quoted separately apart from rate of comput
Read moreDesign, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Design, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Read moreDesign development fabrication, installation, and commissioning of one large capacity climatic test setup,warranty for 2 years,amc for first year,amc for second year,amc for third year
Design development fabrication, installation, and commissioning of one large capacity climatic test setup,warranty for 2 years,amc for first year,amc for second year,amc for third year
Read moreDesign development installation and commissioning of a large size uv exposure test setup,warranty for 2 years,amc for first year,amc for second year,amc for third year
Design development installation and commissioning of a large size uv exposure test setup,warranty for 2 years,amc for first year,amc for second year,amc for third year
Read moreExtension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Extension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Read moreExtension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Extension of lan connection for road sale weighbridges along with 5 years camc after completion of work at siarmal ocp, mahalaxmi area.
Read moreProviding, installation, and commissioning of roof top iron removal plant (irp) filtering unit at kasba view lodge, kamalasagar, sepahijala district along with 3 years of comprehensive amc with 1st year in warranty of supplier.
Providing, installation, and commissioning of roof top iron removal plant (irp) filtering unit at kasba view lodge, kamalasagar, sepahijala district along with 3 years of comprehensive amc with 1st year in warranty of supplier.
Read moreof your Industry type