Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Guntakal Division: Proposed Annual Maintenance Of Water Level Monitoring System For Three Years Along With Integration Of Tms For Br No. 393 Km. 218/0 219/1 &Amp Br. No. 232 Km. 154/1 2 Of Ru Gy And Br. No.474 Km. 110/4 111/2 Of Ya Ndl Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78184611 |
|
Reference Number |
Engg-GTL-Bridges-1730 |
| Tender Fee | 0 |
| EMD | 53600 |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78184611/viewNitPdf_4758160.pdf |
| Start Date | November 15, 2024 22:53 |
| End Date |
Expired
10/12/2024
Expired 678 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Guntakal division: proposed annual maintenance of water level monitoring system in the waterway bridges for three years- total 7 bridges (ru-gy 579 up, gdr-ru 59 up, gdr-ru 118 dn, klu-gy 45, ru-gy 688 dn, gtl-wd 1017dn, bay-gtl 292 up)
Guntakal division: proposed annual maintenance of water level monitoring system in the waterway bridges for three years- total 7 bridges (ru-gy 579 up, gdr-ru 59 up, gdr-ru 118 dn, klu-gy 45, ru-gy 688 dn, gtl-wd 1017dn, bay-gtl 292 up)
Read moreGuntakal division: sw1: ru-nre & gdr-ru-kpd sec: provision of cradle arrangement work for various major bridges and robs in sse/br/ru jurisdiction. sw2: bay-gtl, gy-klu & dmm-pak section: provision of cradle arrangements for the various major bridges and robs in sse/br/central/gtl jurisdiction.
Guntakal division: sw1: ru-nre & gdr-ru-kpd sec: provision of cradle arrangement work for various major bridges and robs in sse/br/ru jurisdiction. sw2: bay-gtl, gy-klu & dmm-pak section: provision of cradle arrangements for the various major bridges and robs in sse/br/central/gtl jurisdiction.
Read moreGuntakal division: proposed annual maintenance of water level monitoring system for three years along with integration of tms for br no. 393 km. 218/0 - 219/1 & br. no. 232 km. 154/1-2 of ru-gy and br. no.474 km. 110/4 - 111/2 of ya-ndl section.
For complete deion and other details, please refer to tender
Read moreS&t requirements in connection with ttr (rails) work in ru-gtl, ndl-dhne, dhne-gtl, dmm-gy, gtl-wd & klu-gtl sections over guntakal division.
For complete deion and other details, please refer to tender
Read moreCustom bid for services - schedule a guntakal division ru gy section hiring of truck of loading cap
Read more
Guntakal division-ru-gy,gy-wd and bay-gtl sections -provision of longer loop line at pathakothacheruvu(plu), chegunta(cgta), bantanahal(bll), nandalur(nre) & kalamalla(kmh) stations.
For complete deion and other details, please refer to tender
Read moreGuntakal division: provision of rooftop solar plants of different capacities on station buildings, service buildings, residential building and lc gates in rc, ad, dmm, dhne, gy, ru, tpty, pak& hx sections of guntakal division.
For complete deion and other details, please refer to tender
Read moreGuntakal division: ru-gy sec: proposed replacement with psc slabs (post tensioned) of steel girders for bridge no.476 dn(9x9.15) at km.. 245/5-6 between knlp-bkpt stations
For complete deion and other details, please refer to tender
Read moreGuntakal division: sw-i: ru-gtl(up&dn): ctr(p): complete track renewal(primary) of exg. 60kg/90uts rail on psc6 sleeper with new 60kg/r260 rail on new wider sleeper 1660 nos./km including recoupment of ballast and deep screening for a length of 1.74km. sw-ii: ru-gtl(up&dn), ndl-dhne-gtl(sl/up), gy-pdl(sl): trr(p) through rail renewal(primary) of exg. 60kg/52kg/90uts rail with new 60kg/r260 rail on psc6 sleeper for a length of 21.58km. sw-ii: ndl-dhne(sl): tsr(p) through sleeper renewal
For complete deion and other details, please refer to tender
Read moreGuntakal division: sw-i: ru-gtl(up&dn): ctr(p): complete track renewal(primary) of exg. 60kg/90uts rail on psc6 sleeper with new 60kg/r260 rail on new wider sleeper 1660 nos./km including recoupment of ballast and deep screening for a length of 1.74km. sw-ii: ru-gtl(up&dn), ndl-dhne-gtl(sl/up), gy-pdl(sl): trr(p) through rail renewal(primary) of exg. 60kg/52kg/90uts rail with new 60kg/r260 rail on psc6 sleeper for a length of 21.58km. sw-ii: ndl-dhne(sl): tsr(p) through sleeper renewal
For complete deion and other details, please refer to tender
Read moreof your Industry type