Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cleaning And Removal Of Spilled/ Fallen Coal Below 4 W Main Belt Up To Ug Bunker From Discharge Point Of Belt Conveyor And Loading The Same In To Belt Conveyor In 4 A Seam Of West Jkd Colliery.
|
Description |
Cleaning And Removal Of Spilled/ Fallen Coal Below 4 W Main Belt Up To Ug Bunker From Discharge Point Of Belt Conveyor And Loading The Same In To Belt Conveyor In 4 A Seam Of West Jkd Colliery.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_313264_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/24-25/45 dtd 24.07.2024 |
Tender Fee | 0 |
EMD | 94600 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324632 |
Start Date | July 24, 2024 23:30 |
End Date |
13/08/2024 ( Expired 328 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning and removing earth coal stone coal silt heaps coal dust sludge liquid mud debrises etc. from drain along the conveyor belt in between unloading point of i/chp at rchp.
Cleaning and removing earth coal stone coal silt heaps coal dust sludge liquid mud debrises etc. from drain along the conveyor belt in between unloading point of i/chp at rchp.
Read moreFabrication and fitting of four nos load v-scrapper at 1200mm wide spreader belt discharge point to increase coal stock of mic, jhanjra project colliery
Fabrication and fitting of four nos load v-scrapper at 1200mm wide spreader belt discharge point to increase coal stock of mic, jhanjra project colliery
Read moreCleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area
Cleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area
Read moreMtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Mtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Read moreSpreading of stone dust and white washing along h.road, tr.road, belt road in 4 a seam up to working distt. of west jhagrakhand colliery
Spreading of stone dust and white washing along h.road, tr.road, belt road in 4 a seam up to working distt. of west jhagrakhand colliery
Read moreRemoval of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Removal of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Read moreDismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Dismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Read moreCollection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.
Collection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.
Read moreWidening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Read moreCleaning of fallen coal along travelling road way in rvi kenda seam working of nj unit of bahula colliery under kenda area ecl
Cleaning of fallen coal along travelling road way in rvi kenda seam working of nj unit of bahula colliery under kenda area ecl
Read moreof your Industry type